前言:一篇好文章的诞生,需要你不断地搜集资料、整理思路,本站小编为你收集了丰富的装饰项目工程管理主题范文,仅供参考,欢迎阅读并收藏。
关键词:装饰工程 ,项目管理,总成装配,深化设计,装修工业化
中图分类号: TQ174.6+4 文献标识码: A 文章编号:
Abstract: the decoration industry the new direction of development of assembly type construction method, is industrialized production and field assembly type construction of a combination that traditional in the house scene produced a variety of finishes by professional production factory to complete, and in the residential site was assembled type construction. This paper first discusses the assembly type construction concept, characteristics and advantages, and points out that the assembly type decoration is inevitable trend of development of the industry; secondly, this paper discussed from design management to equipment and materials procurement management, deep processing of contract management until the scene management assembly assembled in the process of construction project management new problems and solutions.
Key words: Decoration Engineering, project management, assembly, to deepen the design, decoration industrialization
一、 前言
(一) 住宅装饰业的现状
随着我国经济的发展,尤其是近几年房地产业的迅猛发展,人们对住宅装饰的品质需求早已不满足于早期的铺铺地板,抹抹墙灰,刷刷吊顶。首先,基础设施就增加了地热设备、中央空调设备、安防设备、新风系统、中央吸尘系统等等满足人们各种生活需要的设备;其次,饰面材料也丰富多彩,从吊顶到地板,成品装配的产品越来越多:如集成吊顶、成品衣柜、成品户内门、免漆地板等。而厨房的配套设计及工厂化生产则已经成为许多家庭接受的消费模式。近两年随着专业软装公司的介入,又使窗帘、家具、工艺吊灯、装饰品等的设计及供应一步到位。
然而,目前装饰行业的大部分从业人员(包括管理人员)却还是依照传统的装饰工程施工模式进行施工及施工管理,不仅延续了传统装饰模式的种种弊病,更在新型设备新型材料的选择与安装上顾此失彼,从而使住宅装饰工程的质量问题日益复杂化。
(二) 传统装饰模式存在的问题
中国消费者协会1997年3月1日公布,1996年共有18个投诉热点,其中家庭装饰居第13位,上海市居第2位;4月11日该会公布1996年全国12个对消费者损害最多的行业,其中家庭装饰名列第9位;4月18日该会公布1996年13个发生欺诈行为最多的行业,其中家庭装饰居第7位。中国消费者协会认为,工程质量问题是投诉热点。
上述问题说明传统的装饰工程管理模式已不适应时代的发展需要,同时也制肘着新的行业管理理念的形成。
二、 新的装饰模式
(一) 新型装饰施工模式的特点及优点
新型装饰施工模式就是总成装配式的施工方法,施工现场好比一个名副其实的装配车间或总装流水线。凡是进入现场的装饰材料不再是素材 ,而是经过预先加工的总成体系 ,是已经适合现场特定部位安装的组件。总成装配式施工技术管理 ,已不再是将施工工艺、 施工方法进行特定组合的方案编制管理过程 ,不再是按工艺、 质量标准进行现场监控的技术管理 :总成装配式装饰技术管理的主要内容是施工深化设计。
总成装配式施工方式的特点是:1.现场施工装配化。2.材料供应成品化。3.施工图设计专业化4.项目管理全面化。
【关键词】建筑装饰工程;项目管理;管理
前言
在工程项目管理的过程中,建筑装饰工程中的项目管理是其分类的一种。在建筑项目工程管理的对象中,装饰工程项目是一个重要的对象,并且装饰工程项目表明了企业开始向建筑市场开放。在建筑工程项目管理的过程中,要做好方方面面的管理工作,使得建筑工程项目管理向着科学化、法制化、制度化以及规范化的方向发展。
1 建筑装饰施工项目管理的重要性
随着社会主义市场经济的不断发展,项目管理与市场经济相适应。企业为了能够提高自身的市场竞争力,要不断完善项目管理。市场经济的推动使得建筑装饰工程项目管理是非常必要的。建筑装饰施工项目管理能够保证装饰施工工程的顺利实施,而且能够减少建筑装饰施工工程中的问题。
2 在建筑装饰工程中,项目管理的地位以及作用
自从进入改革开放之后,建筑装饰工程项目的地位在不断提高。在装饰工程中,主要以设计为龙头的管理。装饰工程施工单位主要将项目管理作为其出发点,在企业中只有不断发挥项目管理的作用,才可以使得企业向着规范化的方向发展。除此之外,企业要注重项目的质量,使得装饰成为企业的支柱产业。良好的项目管理对于企业来说,不仅能够提高企业的经济效益,而且能够增强企业的市场竞争力。
3 建筑装饰工程项目管理中的关键环节
3.1 投标
在建筑装饰工程项目中,投标能够取得成功与施工企业有着密切的联系。投标人应该对招标文件的全部内容进行研究,并且要正确理解招标文件中的全部内容。在投标文件中,投标人应该将招标项目的价格、项目的计划、技术规范、合同的主要条款等详细的说明。为了能够提高投高承包商的中标率,这就要求投标人必须严格按照招标文件的规定填报。为了能够在招标过程中获得中标,这就要掌握以下几种投标报价的策略:第一,高价赢利的策略。第二,微利保本的策略。第三,低价亏损策略。在中标之后,要与对方签订合同,确定科学的施工图纸。
3.2 施工之前的准备
3.2.1 施工人员的准备
施工人员是建筑装饰工程的实施者,所以施工人员自身的素质影响着建筑工程的质量。建筑装饰施工企业要加强对施工人员的教育。第一,对每个进入本项目施工的人员,要有严格的标准,每一个人员要具有相应的操作技能,在一些特殊工程和难度较大的工程上施工人员必须持证上岗。第二,要不断对施工人员进行质量意识的教育,使得施工人员能够自觉的按操作程序进行操作,这样也就可以保证了建筑装饰工程的施工质量。第三,施工管理人员,尤其是质检人员,应随时对装饰工程施工中的内容、过程进行检查。第四,在装饰工程过程中的各个工序,施工管理人员要坚持自检制度,在整个装饰过程中,要安排专业的人员进行检查,从而保证了装饰工程的质量。
3.2.2 施工技术的准备
在了解了相关的施工图纸之后,装饰工程项目要提出施工图纸中存在的问题,并且将这些问题汇总起来,概括出这些问题的特点。为了能够很好的解决这些问题,要引进先进的技术,不断提高施工技术水平,促进建筑装饰工程项目的顺利完工。
3.2.3 施工材料的准备
施工材料的质量会直接影响到整个装饰工程的质量。为了保证材料的质量,这就要求供应商要提品的合格证或质保书,施工企业同时对一些重要的材料做复试和分析报告,只有当复试报告、分析报告等全部合格后才能够使用这些材料。施工企业为了保证材料质量,企业就要求材料管理部门严格按公司有关文件、规定及相关质量体系文件进行选取材料。
3.3 对施工过程的管理
3.3.1 施工技术
在建筑装饰工程的过程中,具有极其复杂的施工工艺以及繁多的材料。在建筑装饰工程施工现场之前,施工管理人员要做好相关的技术准备。首先,要合理的分析施工图纸,针对实际情况进行分析。从施工合同上的要求出发,使得每一道工序得以优化。装饰工程项目下的每一道子工程要充分考虑施工队伍的情况、材料的实际供应情况以及资金供应情况。除此之外,要考虑到相关的外界因素,包括气候条件等。其次,企业在具体实施的过程中,要对施工工艺的每一关进行严格的把关。对于一些高工序的项目要安排相关的技术人员来完成。最后,要确保建筑装饰工程的按时完工。
3.3.2 材料方面的管理
建筑装饰工程所使用的材料种类是多种多样的,在建筑装饰工程中存在最新材料的应用问题。所以,在建筑装饰工程要将材料供应、采购、分类、储存以及材料的发放问题解决好。针对不同的材料要进行不同的管理,保证每一种材料都能够发挥自身的作用,确保装饰工程项目的质量。
3.3.3 人员的管理
在建筑装饰工程中,人员的专业素质影响着建筑装饰工程的质量。施工队伍不仅需要具备较高的专业素质,而且要恪守纪律,从而可以确保建筑装饰工程的质量。在人员管理的过程中,首先,要增强员工的团结意识,提高施工队伍的凝聚力。其次,要明确施工队伍中的纪律,有利于每一个员工按照纪律来进行,保证装饰工程的质量。最后,在装饰公司内部要奖惩分明,不断提高员工工作的积极性。
3.3.4 施工进步的质量的管理
在建筑装饰工程施工的过程中,要确保工程的进度和质量。在装饰工程中,材料的供应、设计的变化是在所难免的,因此要确保工程的进步,使得装饰工程能够在规定的日期完工。装饰工程实施的过程中,每一道工序要严格按照国家有关规定来进行,保证建筑装饰工程的整体质量。
3.4 控制施工成本
在建筑装饰工程项目管理的过程中,要对施工成本进行合理的控制。在装饰工程项目中,成本的控制起着非常重要的作用。并且在建筑装饰工程项目管理的过程中,要严格监督各项支出的费用,把支出的费用控制在先前计划的范围之内。合理的控制成本,可以保证企业资金链的争产运行,使得资金在建筑装饰工程中发挥出最大的作用。
3.5 安全管理
在对装饰工程项目进行安全管理的过程中,要采用科学的管理方法,协调各个方面,促进建筑装饰工程项目的顺利进行。企业对装饰工程项目要进行综合性的管理,并且采用内容丰富以及标准安全的施工方法,保证装饰工程项目的安全实施。
4 结束语
随着我国科学技术的快速发展,在建筑艺术领域中,建筑装饰成为一个不可或缺的部分。建筑装饰工程看起来是一项简单的工作,但是在实际的施工过程中,装饰工程的质量受到许多因素的影响。在建筑装饰工程中,要充分考虑到施工技术、施工环境以及施工人员等因素的影响,保证了建筑装饰工程的整体质量。
参考文献:
[1]钱文灏.建筑装饰工程项目管理及操作[J].企业导报,2009,5(18)9.
[2]闻俭.试析建筑装饰工程项目管理[J].城市建设理论研究,2013,12(7).
关键词:建筑装饰工程;项目成本控制;管理
中图分类号:F275.3 文献标识码:A
文章编号:1005-913X(2015)05-0225-01
一、建筑装饰工程的概况
随着市场经济体制的不断完善,人们生活水平的不断提升,对建筑装饰工程有了更高地要求。在具体工作中,施工企业必须了解成本控制的含义,提高管理水平,只有这样才能降低投资成本、提高建筑装饰工程的经济效益与社会效益。内装饰与外装饰是建筑装饰工程的主要内容,内装饰包含楼地面、墙柱面、墙裙等多个方面。外装饰包含外墙面、外墙裙、腰线、阳台等方面。建筑装饰施工项目成本是指建筑装饰项目施工过程中所消耗的生产资料转移价值与劳动者为自己劳动所创造的价值的货币形式,是施工过程中项目产生的所有费用的总和。消耗的费用主要包含材料费用、辅助材料费用、机械费用、人工费等。遵循成本管理作用进行建筑装饰项目施工成本的分类,主要分为预算成本、计划成本及实际成本,固定成本和变动成本主要遵循生产费用及工程量关系进行分类。目前建筑装饰工程项目的特点主要包括以下几点。
(一)生产周期短
通常情况下,建筑装饰工程规模不大,即使是较大规模的工程项目,在装饰工程施工中也常常进行多个小标段的施工。作为建筑工程建设的最后阶段,装饰工程工期压力较大,进而减少了装饰工程的生产周期。
(二)装饰风格多样化
每个建筑装饰工程项目的要求都有所不同,复杂程度也不同,进而加大了装修标准的差异,呈现出风格多样的装饰工程。装饰工程具有较高的文化性与艺术性,在设计方案及流行趋势的作用下,装饰工程装修标准也呈现出不同的档次,一般分为:高、中、低三种。
二、建筑装饰工程项目成本控制及管理中存在的问题
随着社会主义市场经济的不断发展,我国建筑事业也取得了不错的成绩。成本控制及管理作为建筑装饰单位管理的重要组成部分,是其管理的一项重要内容。单位管理中必须充分了解成本控制及管理的重要性,根据本单位的实际情况,及时找出存在的问题,才能为单位的可持续发展提供强有力的保障。
(一)成本管理意识薄弱
作为一个全员参与全过程的管理,建筑装饰工程成本管理中,管理层对成本控制的重视程度不足,这样并不利于项目施工的顺利进行,导致工程项目在不同施工区域分散。管理层不属于项目成本中心,而只是利润中心,并不能直接影响到工程成本。在建筑装饰工程中,因受合同相关规定的制约,每个工程都有其规定的工期,工期改变将引起成本的改变,如施工单位盲目提升工程进度缩短工期,将额外增加工程成本,进而增加投资。
(二)材料管理制度不健全
在建筑装饰工程成本控制中,其主要费用开支包括材料费、人工费及施工现场管理费等。材料费是指施工过程中所消耗的构成工程实体的原材料、辅助材料及周转材料费等。在整个投资成本中工程材料费为一半以上。由此可见,在建筑装饰工程成本管理中材料费占有重要位置,对工程质量及成本控制具有至关重要的作用。目前项目经理并没有对人事决策权、财务决策权、进度计划控制权等进行充分利用,在控制材料费用的过程中还存在诸多问题,并没有达到施工成本的合理控制。
(三)成本核算体系不完善
在项目经理承包经济责任制推行过程中,为实现经济效益最大化,往往出现以收定支,人为对成本进行调节。在产值任务完成过程中,单位与单位之间常常盲目比较,在计价方面计划统计部门存在虚报情况,导致计价额和实际计价额之间存在一定差异。在成本管理中严重缺乏事前预测及过程控制能力,成本投入仅靠制度维持,这种管理模式并不符合单位经营管理的需求。
三、完善建筑装饰工程项目成本控制及管理的措施
通过成本核算与其他有关材料分析建筑装饰工程项目成本的构成与多少,在成本变动因素研究的基础上,寻找成本降低的有效措施。成本控制及管理可以对单位经营成本进行正确评估,还可以为成本计划及经营决策的制定提供可靠地依据。在成本控制中,必须对成本降低额度及成本降低率进行充分考虑,为成本降低的分析提供便利。在建筑装饰工程成本控制中,对工程实际成本与预算成本进行比较,有针对性进行管理措施的运用。
(一)提升成本管理意识,完善内部体系
随着社会主义市场经济发展速度的不断提升,我国建筑装饰工程市场经济体制愈加完善,在单位成本管理水平提升的同时,还可以有效提高其市场竞争力,在确保质量、工期及安全的前提下,提升单位成本管理意识,对成本管理进行充分了解与掌握,为降低工程成本提供可靠保障。在建筑装饰单位成本管理体系中应建立科学有效的内部成本管理机制,形成责、权、利统一,决策、运行、控制机制合理配置的成本控制体系。遵循岗位责任、工作目标及成本内容不断对内部成本激励机制进行完善,在实现员工成本责任目标的前提下,实现单位的战略目标。
(二)健全材料管理制度
在材料管理中,通常情况下装饰单位必须与库存相结合,分类管理各个施工材料。为便于管理,可将大用量、高价格的材料归为一类,实现材料分类的统一性及规范化。批量采购原材料,可与供应商进行合作协议的长期签订,可以有效降低材料成本及确保材料质量,并有效提升建筑装饰单位的市场竞争力。在建立双方合作的基础上,装饰单位可以对自身技术水平进行不断提升,并对装饰材料的使用标准进行规范,为项目投标进行准确价格数据的提升,健全单位材料管理制度。
在工程造价中材料费用占50%,其成本控制可分为量与价两个方面进行,合理控制材料的用量。在施工预算的基础上,对材料消耗进行正确核算,并进行限额用料制度的实行,如发现有材料余留应及时收回,并对降低材料消耗各项技术、工艺及材料的推广与应用。
合理控制材料价格。现阶段建筑装饰工程材料类型较多,质量参差不齐,施工单位应对装饰材料的大量市场信息进行准确掌握,在确保工程材料质量的同时,择优选择最低价位材料,降低工程材料费用。如工程规模较大可通过招标方法进行合理价格材料的获取,遵循工程进度及要求,施工单位应进行材料使用计划的合理编制,尽可以降低材料成本。
(三)完善成本核算体系
作为建筑装饰工程项目管理的重要组成部分,成本管理就是将单位经营过程中出现的费用,利用相应的方式进行预测、决策、核算、分析、控制等科学管理,成本降低与效益提高是单位成本管理的主要目的。成本核算作为成本管理中的主要内容,只有确保成本数据的真实性、准确性,才能为单位管理需求提供可靠保障。当成本数据无法对成本实际水平进行真实反映时,将增加成本计划完成情况考核的难度,更对单位经济效益的正确计量造成一定影响,同时还会出现严重的财务失误。加强建筑装饰工程项目成本核算的准确性,应将权责发生制作为其发展的基础,遵循配比原则,对单位财务结果与情况进行客观、真实的核算。对单位支出起到主要制约作用的就是预算编制,通过权责发生制可以确保成本核算和预算配比的合理性,促使预算规制作用的充分发挥。
四、结语
综上所述,随着社会经济的不断发展,建筑装饰工程已经成为我国基础建设中的一项重要建设项目,工程项目成本控制作为建筑装饰工程管理中主要组成部分,其控制及管理水平的高低直接关系着工程的整体质量。在成本控制中,必须有针对性进行管理措施的运用,为降低成本降低提供可靠保障。
参考文献:
[1] 李光耀,曾喻炎.建筑装饰工程项目成本控制研究[J].科技资讯,2006(4).
[2] 李奇凌,李 波.工程项目成本管理中存在的问题与对策分析[A].吉林省土木建筑学会2011年学术年会论文集[C],2011.
[3] 牛军涛,闫胜利,李 明.论施工项目的成本管理[A].河南省建筑业行业优秀论文集(2008)[C],2008.
[4] 卢俊红,冶伟峰.浅析施工企业施工阶段的成本控制[A].河南省土木建筑学会2010年学术研讨会论文集[C],2010.
关键词:装饰工程;项目管理;施工;质量
中图分类号:TU文献标识码:A文章编号:1672-3198(2008)09-0171-01
1 概述
装饰工程项目管理是指以装饰工程项目为对象的系统管理方法,在项目生命周期内,用系统工程理论、观点和方法,进行有效的预测、计划、决策、组织、协调、控制等系统的、科学的管理,实现预计的经济效益,达到预期的效果,表达业主的意图,体现装饰的文化艺术效果和商业要求。
2 装饰工程项目管理的主要内容
根据项目招标要求,编制标书,中标后通过谈判,签订工程承包合同、预算书及主材认价等。并从人力、物力、空间三要素着手组织劳动力,抓好材料供应,加强专业协调,从时间上、空间上科学、合理部署。时间上要求速度快、工期短;质量上要求精度高、效果好;经济上要求消耗少、成本低、利润高。
3 装饰工程项目管理的关键环节
3.1 投标
工程投标的成功与失败关系施工企业的生存与发展,任何施工企业均会高度重视投标工作,尽一切力量来提高投标的中标率。装饰工程投标文件分为技术标与商务标。技术标包括施工组织设计、投入本工程的机械设备、质量保证体系及安全体系;商务标包括工程报价、资格预审资料、资信资料和银行信用资料等内容。
投标文件的编制环环相扣,每一个环节都很重要。而关键在于既能保证可观的利润有极富竞争力的报价。根据建筑市场的特点,以及企业提高市场占有率的需要,商务标的编制可以采用“合理低价,留有余地”的策略。
在富有竞争力的报价基础上还要有装饰设计方案和相关的效果图。好的装饰设计方案会一下子把客户的注意力都吸引过来,让其有身临其境的感觉。
在中标后我们还要签订合同、并进行主材认价、图纸确认等工作。
3.2 施工前准备
(1)施工人员的准备。
施工人员包括项目管理人员和操作人员。施工现场项目管理人员包括项目经理施工员、技术员、质检员、材料员、统计核算员、安全管理员等几个岗位,工程部依据工程规模及难易程度确定管理人员的数量并进行职能分配,项目经理做为项目的负责人,在工程部的领导下,组织本项目人员认真熟悉图纸,与营业部沟通现场用工及材料用量。提出人员及机具计划,在公司要求工期内制定详细的施工进度计划。操作人员是工程部依据项目部提出的劳动力计划,结合公司整体施工项目的进展情况,准备各工种人员,并组织项目部有关人员对入场工人进行入场前的教育及相应的技术安全培训,使工人在入场前对工程项目的技术难度、质量要求有所了解。
(2)施工技术的准备。
项目部在熟悉施工图纸的基础上,对图纸中的问题进行汇总,由总工办组织项目部及营业部结合本公司的施工特点,提出具体的修正方案,报甲方及设计单位共同探讨,以达成一致,使得问题能够在进场施工前得到最大限度的解决。
(3)施工材料的准备。
为了提高计划材料的准确性,由项目部依据营业部下发的分项材料表对各分项材料用量进行核对,及时将修正材料量返回营业部预算员处,由预算员下发材料计划表,此计划表做为采购人员的采购依据提前联系供货单位从而保证材料的供应。项目部同时向采购人员提供材料进场时间要求,从而使采购人员做到心中有数,按部就班的进行材料的准备。
(4)施工机具的准备。
装饰工程所用施工机具大致可分为手使工具及电动工具,电动工具由公司采购部门供应,采购部门依据项目部提供的机具名称,对机具进行检修维护,从而保证机具在施工过程中的正常运转。
3.3 施工过程的管理
(1)施工技术。
作为一个工程项目,特别是装饰工程,其施工工艺复杂,材料品种繁多,各施工工种班组多。这要求我们作为现场施工管理人员务必做好技术准备。首先,必须熟悉施工图纸,针对具体的施工合同要求,尽最大限度去优化每一道工序,每一分项(部)工程,同时考虑自身的资源(施工队伍、材料供应、资金、设备等)各气候等自然条件,认真、合理地做好施工组织计划,并以横道图或网络图表示出来,从大入小,由面及点,确保每一分项工程能纳入受控范围之中。其次,针对工程特点,除了合理的施工组织计划外,还必须在具体的施工工艺上作好技术准备,特别是高新技术要求的施工工艺。技术储备包括技术管理人员,技术工长及工人,新技术新工艺培训,施工规范,技术交底身先士等工作。只有拥有高素质的技术管理人员,洞悉具体的施工工艺才能确保施工过程的每一工序步骤尽在掌握之中,了然于心,做好各方面突况的处理准备方案,以保证能按时保质地完成。通过有计划有目的的培训,技术交底,可以使施工技术工人,工长熟悉新的施工工艺,新的材料特性,共同提高技术操作、施工水平,进而保证施工质量。
(2)材料方面。
相对于土建施工,装饰工程有其固有的特点,主要的一面,就是其所需的材料种类繁多,并且,经常有许多最新的材料应用的问题。因此,针对材料的问题,必须解决好材料的供应、采购、分类堆放以及材料发放。
(3)人员的管理。
从一定意义上来说,人是决定工程成败的关键。所有的工程项目均是通过人将材料组织而创造出来的。只有拥有一支富有创造力的、纪律严明的施工队伍才能完成一项质量优良的工程项目。首先,必须营造出一种荣辱与共的氛围,职责分明但不失亲和力,让所有的员工都感到自己是这个项目的大家庭中的一员。这就需要我们施工现场管理人员充分发挥自己的才智,对工人要奖罚分明,多鼓励、多举办各类生产生活竞赛活动,从精神物质上双管齐下,培养凝聚力。其次,必须明确施工队伍的管理体制,各岗位职责,权利明确,做到令出必行。一支纪律严明的施工队伍,面对工期紧逼,技术复杂的工程,只有坚决服从指挥,才能按期保质完成施工任务。再者,针对具体情况适当使用经济杠杆的手段,对人员管理必定起到意想不到的作用。
(4)施工进度和质量。
施工的关键是进度和质量。对于进度,原则上按原施工组织计划执行。但作为一个项目而言,现场情况千变万化,如材料供应,设计变更等所难免,绝对不能模式化,必须根据实际情况进行调整、安排。施工质量能否得于保证,最主要的是一定要严格按照相关的国家规范和有关标准的要求来完成每一工序,严禁偷工减料。必须贯彻执行“三检”制,即自检、专检、联检,通过层层的检查,验收后方允许进入下一道工序,从而确保整个工程的质量。
3.4 成本控制
装饰装修工程项目的成本控制要贯穿在装饰装修工程项目的实施过程中,对各项费用的开支进行监督,及时纠正发生的偏差,把各项费用支出控制在计划成本规定的范围内,以保证成本计划的实现。成本控制的办法很多,而且具有一定的随机性,要根据不同的工程情况采用与之相适应的控制手段和控制方法。
4 结束语
加强施工企业的技术质量管理,是装饰施工企业管理的一个重要环节,更是保证施工质量的关键。也是企业长期生存下去的保证。通过对上述关键环节的管理,可以有效的提高施工企业中的管理质量,更好地保证企业的效益。
参考文献
装饰装修工程项目成本管理,就是在完成一个工程项目过程中,对所发生的成本费用支出,有组织、有系统地进行预测、计划、控制、核算、考核、分析等进行科学管理的工作,它是以降低成本为宗旨的一项综合性管理工作。进行成本管理是装饰装修企业改善经营管理,提高企业管理水平进而提高企业竞争力的重要手段之一,从公司实行项目管理的情况来看,多年来无论工程质量、工期管理、文明施工等方面都取得了一定的成绩,但是企业总体效益不理想,利润较低。本人就如何加强项目成本管理发表个人意见。
一 项目成本管理中存在的问题
(一)成本管理意识不强
在项目成本管理中,公司级管什么,项目部管什么,责任不明确,虽然项目部都配有预结算人员,但责任不落实,工作不到位,财务、材料、合同、计划统计等部门工作脱节,有预算无核算,大部分无项目经济分析比较,没有具体的节超建议和措施,即使能从结算上反映项目盈亏,但弄不清盈亏原因。
(二)人员素质不高,责任心不强
有部分具有施工管理和组织经验的人,成本管理能力有限,文化水平及专业理论知识水平不高;具有理论知识水平的大学生经验又不足;具有理论知识、实践经验及成本管理经验的复合型人才不多。尤其是现场人员流动较频繁,工作不连续,干多干少收入差不多,责任心不强。
(三)材料管理不严,浪费现象严重
材料费用占整个工程造价的60%,材料费用的盈亏直接影响到整个工程的盈亏。有些项目部无严格执行领料用料制度,从仓库领料有数,但余料无回收,失窃浪费严重,小型手动工具更无人爱护,有时借出有手续,返还无验收;或下料计算不准确,损耗率超标。材料看管不严,遗失时有发生;材料型号不对,造成闲置浪费,材料供应量与实际不符;监督机制不健全,出了问题往往追究不到责任人,这也造成成本失控的主要原因。
二 加强成本控制管理的措施
(一)加强项目部对施工项目成本核算意识及观念的转变,建立和完善项目成本核算的管理体制
建立项目经理责任制和项目成本核算制是实行项目管理的关键,而“两制”建设中,项目成本核算制是基础,它未建立起来,项目经理责任制就留于形式。项目成本核算又是项目成本管理的依据和基础,没有成本核算,其它成本分析考核、成本控制、成本计划等工作就无从谈起。因此,改革现行的成本核算员管理体制,由公司对各项目成本核算员实行统一委派,集中管理,不定期轮岗,定期或不定期学习、交流、考核、激励竞争上岗,使工程项目成本核算员切身利益与工程项目分离,才能建立健康有序的施工成本管理与核算工作网络程序。
(二)加强施工成本核算监督力度,增强成本核算员自身的素质建设和工作责任感
各工程项目经理部人员应自觉认真学习和严格贯彻执行企业制定的施工成本控制与核算管理制度,并保持自律,不利用职权或工作之便干扰成本核算管理工作,使施工成本管理真正落到实处。同时,要全面提高核算员的技术业务素质,对那些无经过专业学习和培训,未按规定持证上岗,业务不熟悉,核算能力有限,无法保证成本核算的质量和工作的人员,要迅速组织培训学习,尽快提高他们的素质。对在业务上敷衍了事,弄虚作假,欺上瞒下,得过且过的人员,要注意提高他们的业务素质和道德素质的水平,提高他们的工作责任感。
(三)抓好成本预测、预控,认真履行经济合同
项目成本的管理,首先必须抓好项目成本的预测预控。工程签约后,公司和项目部同时开展编制施工预算、成本计划,结合现行、当地人工、材料的市场价,测算出工程总实际成本。在项目的各项成本测算出来后,对项目成本、成本降低率、质量、工期、安全、文明施工等详实约定。通过合同的签订,按合同中的责任,自觉地履行各自的职责,以保证项目施工顺利完成。
(四)加强材料管理
加强材料管理是项目成本控制的重要环节,一般工程项目,材料成本占造价的60%左右,控制工程成本,材料成本尤其重要,如果忽视材料管理,项目成本管理就无从谈起,材料管理必须是全方位、全过程管理。
(五)提高项目班子的整体素质
以项目经理为代表的项目管理班子的素质很重要,如果这层人素质低,将直接反映整个项目的管理水平低下,因此,要想方设法提高项目班子人员的素质,特别是项目经理的整体素质,组织进行内部交流学习,向同行吸取先进经验,不断提高项目经理的管理水平。
(六)科学改进项目成本核算制度
关键字:装饰装修工程;项目管理;进度;质量;安全;人员Abstract:As an important part of the field of Construction Engineering Decoration Engineering, has an important influence on public life. With the improvement of living standards, people have greatly improved in all aspects of decoration engineering requirements. Therefore strengthen decoration engineering project management level is of great realistic significance. This paper discussed on the decoration project management involves the renovation of several core elements such as schedule, quality, safety, personnel, with a view to the decoration project management to enhance the level of play a certain role.
Keywords: Decoration Engineering; project management; progress; quality; safety; personnel
中图分类号:TU238 文献标识码:文章编号:
引言:作为建筑工程领域中一个重要分部工程,伴随着建筑工程的快速发展,装饰装修工程也在高速地发展。然而,近年来却经常出现质量、安全事故以及工期、费用的索赔事项等。加之人们生活水平的提高,更加注重装饰装修工程的质量与安全。因此为了更好地确保工程进度、质量、安全目标实现,应该对工程的各个相关环节进行精细化的管理。下面就此依一展开论述。
一、进度管理
根据划分的每一个施工过程,计算相应的工程量,进而确定项目的持续时间。最好按合理工期确定进度目标,避免赶工、抢工,确保合理的成本支出。接下来确定合理施工顺序,按照施工的技术规律和合理的组织关系,解决各项目之间时间先后或者是工序搭接的问题;采用流水施工的组织形式,保证工期的连续性和均衡性。具体方法如下:
首先应该根据网络图确定工程施工的总工期,再看关键线路上的关键节点,以确定工程进度所需要管理的重点;提到网络图的编制,就要根据工程的特点和具体工程施工的要求编制网络进度计划,并作出相应的分解,以方便对各个合同控制的工期进行管理;编制月作业计划和施工任务书,顾名思义,施工任务书是计划与实际操作的纽带,上面记录着各班组需要承担的任务,以及技术管理、质量管理的具体操作步骤,并将其下达到个人,它不仅是一份原始的记录凭证,更是造价人员进行预算的依据;进度管理还包括依据建筑装饰装修的法律法规办理相关的手续;对于外部各方面的条件应积极配合、协调,保证装饰装修过程中材料、水、电等的供给。在装饰装修的施工现场要及时准确地做好记录,作为以后查实的原始凭证,如开工日期、工作的进度等等,把这些原始文件和和相应的图表依据形成记录文件,有备无患。为了在进度控制方面起到协调作用,要在实际的管理过程中做好调度工作,对于施工过程中出现的各种矛盾要最大限度地排除,协调配合好各种关系,如上下级的关系,总分包的关系,分包之间的关系等;对于上述提到的调度工作,主要是检查作业中出现的问题,并提出相应的解决措施;检查施工现场设备的使用情况以及用电等,出现问题时及时更换,以免耽误施工总进度,其他没有规定的要按照施工任务书严格执行;在进行进度管理时,要进行相应进度的检查,检查的方法可以是计划与实际的对比,可以直观地看出不一致即产生偏差的地方,及时地进行补救,可以在图上进行,例如用横道计划表、网络计划图等进行。
在进行进度管理的时候,对于各专业的分包以及主要大型设备的供应商要及时地确定好;施工单位应督促施工人员按照合同要求进行相应的施工;如果实际中出现了与计划不符的情况,要经过协商,调整进度计划;督促各分包单位按照工期的要求及时进场,督促各材料供应商及时供货;对于出现的各种事故,可以依据合同进行工期的索赔;要定期向委托人如实汇报装修的进度情况;进度管理还要求装饰总包单位及时根据施工进度的情况,定期召开工期例会,总结存在的问题,以便下一阶段不再出现类似的情况;施工完毕之后及时参与进行竣工验收,验收合格之后方可移交委托单位。
二、质量管理
质量管理是整个项目管理中非常重要的环节,在项目管理中就要做到:依法对工程建设项目中专业分包、主要材料设备厂商进行招标;将专业工程及关键材料设备发包给具备相关资质条件的合格厂商;施工单位要建立相应的质量控制体系和措施,核实质量文件;组织相关技术人员到现场进行勘查,熟悉场地,对周边环境有所了解,并组织图纸会审工作和设计交底;按合同规定的要求,履行相应的监督工作;审核并签认设计变更、工程技术洽商;对用于工程的关键材料、设备进行检查验收,进场的材料必须有检验合格标志和相应的出场证明,否则会造成质量不合格引起返工窝工的现象;督促处理重大工程质量问题、质量事故,最好在事故发生前及时预防,避免重大的经济损失;管理人员应依据合同文件、设计图纸和技术规范要求等,对单位工程、分部工程进行监督、检查和验收。
三、安全管理
施工过程中的安全隐患时刻存在,因此要做好施工项目的安全管理,安全对于委托方和施工人员都是至关重要的。各部门对于施工中的安全责任进行分解,落实到个人,这样就把工程的好坏与个人的利益联系到了一起,对于安全管理的实施可以起到很大的促进作用;其次要按照装饰装修领域相关的法律法规,办理相关的申领手续,将施工项目中所用到的各种证照办理相关的手续;如果条件允许还应办理相关的手续,确保工程的万无一失;项目经理组织相应有关专业人员到施工现场进行实地的检查,严格按照图纸进行施工,对于出现的安全隐患应该及时地进行排查,防患于未然;施工中如果已经出现了安全问题,应及时地进行改正,并针对施工风险提供可行的解决措施,将安全风险系数降到最低;对于出现地安全事故应该找出其中的原因,及时报请有关部门进行处理;分包单位也要进行相应地施工现场安全管理,落实检查的实际性;为了方便以后进行安全方面的查证,在竣工之后要进行专项报告的编制。
人员管理
无论在何种行业,人都是决定成败的关键。装饰装修行业亦不例外,安全管理、质量管理等都是由人员的管理才能发挥它的作用。只有拥有一支富有创造力的、纪律严明的施工队伍才能完成一项质量优良的工程项目。进行项目管理时,也要对相应的人员进行再教育,掌握先进的技术,对工程进行建设时,要着重培养现场施工人员的责任感和团队精神,对于一些表现突出的要给予一定的奖励,实行奖励制度,从管理学的角度看,要满足不同员工的需求,这样才能发挥他们最大的能量,更好地为企业服务。怎样才能将施工队伍中的技术管理人员和技术工人有机地结合成凝聚力、战斗力较强的团队。首先,遵循以人为本、知人善用、用人不疑、掌控有度,从而营造出一种荣辱与共的氛围,职责分明但不失人文亲和力,让所有的员工都感到自己是这个项目的大家庭中的一员。这就需要我们施工现场管理人员充分发挥自己的才智,对工人要奖罚分明,多鼓励、多举办各类生产生活竞赛活动,从精神物质上双管齐下,培养向心力。其次,必须明确施工队伍的管理体制,岗位职责,权利明确,做到令出必行,行必有果。拥有一支纪律严明的施工队伍,就算面对工期紧逼,技术复杂的工程,只要坚决服从指挥,才能按期保质完成施工任务。再者,针对工程实际运作过程中反馈出的具体情况适当使用经济杠杆的手段,进行规范量化,对人员管理必定起到柳暗花明的作用。
五、合同管理
合同是进行索赔的关键依据,双方签订相关合同,对施工各方的责任做出明确的规定,以便发生纠纷时提供参考。首先要根据工程的特点制定相应的合同,并针对双方拟定一定的合同草案;其次要进行合同的签订,对于要出现的危险源,要在合同中载明,并进行相应的分析。对于施工单位来说,合同是索要薪资的重要依据,要在合同中注明付款方式以及最终的结算方式,写明工程保修的责任。合同的审查批准制度施工企业在施工合同签订前还应实行审查、批准制度。即在各业务部门会签后,送交合同专门管理机构或法律顾问审查,再报请法人代表签署意见,明确表示同意对外正式签订合同。这样,通过严格的手续,使合同签订的基础更加牢靠。还应做好合同签订时的管理,为履行合同打好基础建筑工程具有投资大、工期长、结构复杂、受场内场外环境影响大,不可预见性因素多的特点。施工合同应尽量做到内容完整,条款说尽,表联明确、严密。为此,合同谈判人员要在合法、依法、平等原则的基础上,通过对工程信息的调研与反馈,制定出严密、周详、可行的谈判方案,不打无准备之仗。
结语:笔者结合多年的工作经验,针对装饰装修工程项目管理实施期的工程进度、质量、安全、合同以及人员管理作了简要的总结分析,以期能对今后的工程实践以借鉴。装饰装修工程作为和大众生活直接相关的建筑工程,在很大程度上影响着大众生活质量。为此装饰装修工程要求每一个参与人员能树立起更强的责任心,为打造和谐幸福生活贡献自己的力量。
参考文献:
[1]黄俊纪.浅谈建筑装饰施工质量控制[J].建筑与装饰,2008,(7).
关键词:建筑装饰工程项目;成本控制;管理
成本管理作为企业管理的核心,如何适应新时期企业经营管理的需要,成为企业兴衰的主要课题。针对施工企业成本管理中存在的缺陷进行分析,对如何搞好成本管理提出几点思考。
1、当前建筑装饰工程成本管理存在的问题
1.1 成本管理的意识落后。从意识角度来看,工程成本管理应该是一个全员参与全过程的管理。从装饰企业与项目经理部管理层面来说,部分企业没有从企业管理层面加以控制,由于建筑工程推行项目法施工,各工程项目分散于不同的施工区域,企业管理层属于利润中心而不是成本中心,无法对工程成本施加影响。对于项目而言,由于深受合同条款的约束,在保证工程生产方面易于达成共识,对工期成本及项目盈亏却无暇顾及。工程项目都有其特定的工期要求,保证工期往往会引起成本的变化,盲目地赶工期要进度,就会造成工程成本的额外增加,效益向生产低头的典型表现。
1.2 内部成本管理层面。从项目经理部内部成本管理层面来说,内部分工缺乏协调与沟通合作,部门之间以为成本管理是财务部门的事,技术人员只负责技术和工程质量,施工人员只负责施工生产和工程进度。不进行成本分析考核,离开成本管理抓效益的做法,是造成一些单位管理粗放、效率低下、亏损严重、发展缓慢的主要症结。为了赶工期而盲目增加工人和设备,必然会导致窝工现象而造成人工费的浪费,如果材料管理人员现场数据不精确,必然会导致材料二次搬运费的增加;如果技术人员采用了可行但不经济的技术措施,会使工程成本增大。
1.3 应变能力差,缺乏竞争意识。近年来,随着市场经济的深入发展,建筑市场招标竞争激烈。面对市场竞争的沉重压力,不少施工企业盲目揽任务,不惜赔血本中标,使企业陷入越干越亏的境地;有的企业不计成本盲目铺展,贷款垫资施工,结果使企业背上沉重的包袱,危及企业的生存发展,给企业造成严重的经济损失。
1.4 成本核算体制不适应市场经济的需要。成本核算包括:
1.4.1 预算成本。指根据施工图计算的工程量和预算单价确定的工程预算成本,反映了为完成工程项目建筑安装任务所需的直接费用和间接费用,这也是工程项目合同签订的直接依据。
1.4.2 实际成本。指项目在施工生产过程中实际发生的生产费用支出的总和。
1.4.3 目标成本。是指按企业的施工预算确定的目标成本,这一目标成本是在装饰工程项目经理领导下合理组织施工、充分挖掘潜力、采取有效的施工组织计划和加强管理经济核算的基础上,预先确定的工程项目的成本目标。
由于缺乏成本管理中的事前预测和过程控制,只能靠制度被动地没有预控地投入。一旦反映在财务帐面上成本失控,已是既成事实。这种管理模式,与现代企业管理的要求相差甚远。
2、健全完善工程项目成本管理的措施
2.1 平衡效益与质量的关系,以工程施工预算和施工组织计划为蓝本。加强质量成本管理,降低工程成本质量成本管理的目标是使质量成本的综合值达到最低值。一般来说,质量预防费用起初较低,随着质量要求的提高逐渐会增加,当质量达到一定水平再要求提高时,该项费用就会急剧上升。质量检验费用较为稳定,不过随着质量的提高也会有一定程度的增长。而质量损失则不然,开始时因质量较差,损失很大,随着产品质量不断改进,该项损失逐步减少。
2.2 降低工程成本,通过工期成本控制,提高工程效益。工期成本管理的目标是正确处理工期与成本的关系,使工期成本的总和达到最低值。工期成本表现在两个方面:
2.2.1 项目经理部为了保证工期而采取的措施费用。
2.2.2 工期拖延而导致的业主索赔成本。
2.3 围绕施工预算合理划分工程项目成本核算对象并建立成本核算明细账。施工预算是确定装饰工程合同费用的直接经济依据,是整个成本管理与核算的中心环节,围绕施工预算分部分项工程作为成本核算对象同时建立成本核算明细帐。
2.4 必须完善内部成本管理体系,走科技创新增效之路。
2.4.1 要建立法人、项目经理部、作业层三级成本管理体系,正确处理三级之间的关系。法人为经营决策、成本利润、资金控制中心;项目经理部为工期保证、质量创优、成本核算、资金回笼中心;作业层为施工生产、现场管理、队伍管理中心。建立以企业法人为核心,项目管理为重心,作业层管理为基础的成本管理体系。重点是搞好工程项目“一级管理、两层分离”,一个项目只允许设一个银行帐户,一本财务预算总帐,一本成本物资总帐。作业层建立规范的成本核算台帐,实行日清月结,能核算出当日成本收支,及时调整估算出当日成本盈亏的管理机制。
2.4.2 建立科学有效的内部成本管理运行机制,努力形成责、权、利相统一,决策、运行、控制机制相配套的成本制衡机制。完善内部的成本激励机制,按岗位责任、工作目标、成本内容与每个人的工资奖金挂钩,上下浮动,促使全体员工在实现各自成本责任目标的同时,实现整个企业的成本利润目标。将各项直接费用,区分计入当期的工程成本或计入其他期间的成本。
3、加强建筑装饰工程项目成本控制与管理的几点思考
3.1 树立“低成本,高质量,高效益”的观念
要树立效益第一的观念。确实把企业的各项工作重点转移到以经济效益为中心上来,用效益第一的观点来统领企业的各项工作;以效益评先进、选人才、形成人人讲效益,环环抓效益,事事增效益的良好气氛。要树立以优取胜,以精品工程占领市场的观念。要把建筑产品的工程规模、科技含量、内在质量、外在观感度作为创造精品工程的基础,变为全体员工的一种自觉行动,力求打造出有代表性、有影响力精品工程,获得市场竞争的主动权。
3.2 树立科学决策,化解市场风险的责任意识
科学决策是决定一个企业能否适应市场、获取市场份额的头等大事,也是衡量各级管理者水平的试金石。同样的市场,同样的环境,不同的决策,会给企业带来不同的命运。因此,决策前必须深入实际调查研究,认真进行可行性分析;决策中集思广益,分析深透,对市场可能出现的风险及企业承担风险的能力要有充分的思想估计,把风险降低在可控范围之内。同时,建立起谁决策准负责的责任追究制度,确保决策不失误。
参考文献
【关键词】建筑;装修;施工;管理
中图分类号: TU71 文献标识码: A 文章编号:
一、前言
大型建筑工程,因涉及工种多,技术含量高以及各个环节的协调等许多问题,使得实施项目管理显得格外重要。建筑工程施工项目的管理是指在整个建筑周期中,利用系统工程理论,结合其他先进管理手段,对项目进行规划、决策、组织、协调、控制等,力求工程质量、工期、造价、环保达到预期目标,因而建筑工程项目管理水平的高低直接影响到建筑工程的最终效果。
二、招标及合同协议签订
由业主准备开工条件,装饰工程需准备的客观条件、装修资金及相关信息。具备开工条件后,公开招标信息。业主应深入了解各承包商的资质、能力、工程经验、以往信誉、为当前的项目做的各项安排,通过公平、合法的原则选择有利于项目实施且报价低而合理的承包商。承包商应了解业主的要求,正确理解招标文件、合同文件的详尽内容。了解装饰工程的技术难度,分析合同的风险,经过测算有一定的利润,在此基础上签订一份慎密而严谨的合同。这一时期业主与承包商交往密切。但主要应避免以下几类情况的发生:业主对装饰项目的目标不明确、随意性强;业主对装饰材料、施工工艺要求、市场价格方面了解不够;业主与承包商有着千丝万缕的关系,有违法暗箱操作的想法;业主资金准备不足;承包商无利润竞标,并准备在施工阶段通过变更、索赔来产生利润;承包商施工资质有问题、人员和施工设备不足以及有不良信誉。在这阶段埋下的隐患,可以使装饰工程项目合同实施的全过程出现问题,也是当前我国建筑领域问题集中所在。对此只有通过加强法制建设和提高职业道德来解决。
三、施工准备
业主应按合同及本着装饰工程顺利进行的主旨协助承包商进行进场准备。承包商应着手进行下述工作:成立项目经理部聘任项目经理及施工管理人员和施工设备;做出施工组织设计,主要包括施工措施方案,施工进度网络图、施工平面布置图;制定施工项目管理目标,明确责权利,以便实施项目管理;进行现场准备工作,进一步掌握施工条件;编写开工申请报告并按合同上报。至此,已进入装饰工程合同执行阶段,应注意:业主认为合同开始执行就放松管理。一般在合同中应约定的进场准备与外部单位交涉的事务,与装饰施工有关的资料包括水、电、暖通、强弱电、综合布等的交待工作,都不可忽视;承包商进场的人员和设备应可以完成装修工程;施工组织设计不宜敷衍了事,以体现承包商的经验与水平。
四、装修工程施工过程的管理策略
1、施工技术的准备
作为大型建筑装饰工程,其施工工艺复杂,材料品种繁多,各施工工种班组多。这要求我们作为现场施工管理人员务必做好技术准备。首先,必须熟悉施工图纸,针对具体的施工合同要求,尽最大限度去优化每一道工序,每一分项工程,同时考虑自身的资源(施工队伍、材料供应、资金、设备等)各气候等自然条件,认真、合理地做好施工组织计划,并以横道图或网络图表示出来,从大入小,由面及点,确保每一分项工程能纳入受控范围之中。其次,针对工程特点,除了合理的施工组织计划外,还必须在具体的施工工艺上作好技术准备,特别是高新技术要求的施-I=工艺。技术储备包括技术管理人员,技术工长及工人,新技术新工艺培训,施工规范,技术交底身先士等工作。只有拥有高素质的技术管理人员,洞悉具体的施工工艺才能确保施工过程的每一工序步骤尽在掌握之中,了然于心,做好各方面突况的处理准备方案,以保证能按时保质地完成。通过有计划有目的的培训,技术交底,可以使施工技术工人,工长熟悉新的施工工艺,新的材料特性,共同提高技术操作、施工水平,进而保证施工质量。
2、合理组织材料供应
(1)提前联系供货单位,从而保证材料的供应。并且要了解供货单位的信誉,不能仅凭供货合同的约束和口头承诺,我们在承建北京全国总工会精装修项目时就遇上这种情况,因为大堂干挂石所用石材较为稀缺,供货厂家为了竟得材料供货,不惜假造供货时间,拖后工期一个月,虽然供货方要赔违约金,但对施工方而言,这个误工损失和名誉损失绝不是一点违约金能补偿的了。
(2)项目部同时向采购人员提供材料进场时间要求,从而使采购人员做到心中有数,按部就班的进行材料的准备。
(3)做好材料的采购、进货计划,按工程量和技术标准准确提料,根据施工进度要求,
(4)保证材料供应;合理组织材料的加工、储备、运输,提高材料的供应效益,确保装饰工程的正常进行。
3、施工项目人员的管理
项目的管理者应从心理行为、技术水平等方面进行人员的管理,并根据工程特点,结合经验分析对施工人员进行调配和选用。对于技术难度大、造型复杂、精度要求高、相关工序质量影响大的工序和操作,应由技术熟练、经验丰富的工人来完成,严格控制技术人员的素质,坚持持证上岗,杜绝在技术上不懂装懂的工作态度。从一定意义上来说,人是决定工程成败的关键。所有的工程项目均是通过人将材料组织而创造出来的。只有拥有一支富有创造力的、纪律严明的施工队伍才能完成一项质量优良的工程项目。必须营造出一种荣辱与共的氛围,职责分明但不失亲和力,让所有的员工都感到自己是这个项目的大家庭中的一员。这就需要我们施工现场管理人员充分发挥自己的才智,对工人要奖罚分明,多鼓励、多举办各类生产生活竞赛活动,从精神物质上双管齐下,培养凝聚力。其次,必须明确施工队伍的管理体制,各岗位职责,权利明确,做到令出必行。一支纪律严明的施工队伍,面对工期紧迫,技术复杂的工程,只有坚决服从指挥,才能按期按质完成施工任务。再者,针对具体情况适当使用经济杠杆的手段,对人员管理必定起到意想不到的作用。在做好人员管理的同时要着重做好技术准备:首先,必须熟悉施工图纸,针对具体的施工合同要求,尽最大限度去优化每一道工序,每一分项(部)工程,同时考虑自身的资源(施工队伍、材料供应、资金、设备等)气候等自然条件,认真、合理地做好施工组织计划,并以横道图或网络图表示出来,从大入小,由面及点,确保每一分项工程能纳入受控范围之中。
五、竣工验收办理交接及工程结算
应按合同约定进行竣工验收工作,完成后办理双方交接手续。根据合同及变更和索赔进行结算,同时承包商在参加验收,整理并移交竣工文件及相应交接手续后解散项目经理部。从业主的角度,首先装修工程成品要达到合同约定标准,当然也要查看施工记录,过程检查中间验收的全部资料。验收依据是合同及合同所约定的技术标准。建筑装修工程的保修服务应以合同约定为主,业主不宜以此作为卡承包商的手段。承包商更不应以所剩质保金多少来看待保修的重要性,也要考虑到这是影响自己在行业中口碑的一件很重要的事。
六、结论
大型建筑工程的施工项目管理是一项复杂的管理科学,必须运用科学管理、科学发展、科学实施的管理观念,违背科学观就可能潜在着隐患,大型建筑工程质量保障是要保障大型建筑在竣工后正常使用寿命内的安全保障和有效使用,并非工程验收就万事大吉。所以,大型建筑工程质量是良心的质量,是建筑施工全体参与人员的道德素质质量和技术能力质量的综合体现。
【参考文献】
[1] 许巧林,李星辛.浅谈大型建筑装修工程的施工项目管理[J]. 四川建筑. 2005(06)
关键词:机电安装;工程施工;项目管理
Abstract: generally speaking, industrial mechanical and electrical installation project engineering more in transportation, geographical environment conditions are relatively poor areas, because the project scale to a wide range of and objective conditions and needs of the application is hard discipline theory with larger span and to further increase the link project management difficulty. How to better manage project to become an important problem, in the paper from the connotation characteristics and the management science thinking and so on has carried on the discussion.
Keywords: mechanical and electrical installation; Engineering construction; Project management
中图分类号:TU71文献标识码:A 文章编号:
一、工业机电安装项目工程内涵特征
工业机电安装施工进程涵盖采购设备、调试安装、运行生产、竣工验收等较多环节,加上随着工业生产规模的持续扩充较多新工艺、新技术、新设备与新材料不断涌现,这就对工业机电工程项目的安装技术与实践管理提出了更高的要求。相比于建筑构筑物工程,验收工业机电工程具有显著的区别,其特征具体体现在评估质量方式、售后服务与验收工程手段层面。由此不难看出,工业机电工程安装与管理具有工期长、难度大、项目管理实施困难等内涵特征。
二、工业机电安装工程实施项目管理科学思路
工业机电安装工程实施项目管理进程中应用费用时间问题、模型及计算方式、网络计划相关技术与费用进度管理手段获取了一定管理成效,同时其应继续结合工业具体机电设备的管理安装工程实施进度、管理费用特征,于开始项目阶段详细制定工程质量、进度与控制成本计划。另外,我们应伴随实际工程的发展实施设备机械、人员、费用的合理安排与投入管理,进而充分满足各工程阶段质量、进度与成本需求,实现项目运行最大化施工利润与最低化成本管理目标。
三、工业机电安装项目工程质量管理
工程项目质量是其实践管理的核心环节,是实现工程任务与工程效益的最基本保证。因此我们应将该项目管理环节作为重点实践工作。
首先,我们应创建以项目经理为核心、总工程师、副经理与各专业负责人、作业班组长统筹构成的控制质量管理体系。由实体工程形成、施工工艺、层次、方式、设备机具、人员素质、建设环境、使用材料与进场管理等层面对工程安装质量实施全面的控制与策划。基于人是影响工程质量的首要因素,我们可通过有效保障人员素质提升工程质量,即保障人员技术水平与素质内涵,通过有效的评估考核合理调整普工与技工比例。对技工我们应要求其持证上岗,科学开展全员性培训,提升施工安装人员综合技能水平。
工程设备质量、半成品、原材料等级、阀件、零部件、配件等材料设备质量也会对工程安装质量产生显著影响。因此,我们应通过严格的技术交底与图纸会审,确保各分项工程、施工组织规范优质,不应轻视上述环节或走过场,而应审查相关图纸设计的规范性,核实其是否符合相关质量技术标准、设计方案是否优化合理。工程施工建设中倘若发觉图纸包含不良问题或缺陷我们应及时申报处理,不应未经批准擅自实施设计变更。日常项目管理中我们应注重整理收集隐蔽工程签证验收资料,避免监督管理流于形式,应做好施工日志的完整记录。
再者,我们应结合工业机电安装项目工程实际状况、施工企业自身水平能力实施因地制宜的综合考量、全面分析,这也有利于全面提升工程安装施工质量。对工程质量产生影响的环境因素包含管理工程环境、技术环境、劳动作业环境等,因此对该类影响因素我们应充分重视并实施科学控制,尽量为工业机电安装项目创设适宜的环境条件。
四、工业机电安装项目工程进度管理
工业安装机电工程建设施工可分为预埋、安装、调试试运行3个阶段,高峰施工期于安装阶段呈现。工程开始后,我们应依据工业总体工程计划进度合理编制控制进度计划,将其控制目标进行细化分解,并依据不同阶段落实施工任务至各作业班组中,进而形成良好的控制项目进度管理体系。同时,我们应依据工业机电安装实际工程各阶段需求进行作业施工安排的合理修正,调配设备机械、施工人员与费用等各投入环节,进而保证工程各阶段目标进度的合理实现。
工业机电安装项目预埋阶段施工主体任务在于配合工业相关土建工程进行施工,安装电气设备的埋件、机电管路等。可以说该阶段工期相对宽松,且承担任务量较小,但此项工作比较繁杂,耗时且成本投入大,产出小,对后续的工期影响也较大,因此在项目进度管理上应主动积极开展安装工作,避免形成前松后紧的不良任务安排状况或出现返工、漏埋错埋埋件的情况。
进入主体安装与试运行工程阶段,我们应依据工业各机组并网发电要求目标与实际现场状况进行施工计划进度的再次细化,对后续设备机械、人员等施工力量进行有效调配,并确保组织施工形式、工序的科学合理安排,我们可应用专业承包或班组管理、技术骨干负责等方式令权责逐步理清并显著提升工程建设进度,良好形成工业机电安装项目工程的建设施工进而合理实现工业机组控制进度综合目标。
五、工业机电安装项目工程安全管理
安全是各类工程项目施工建设的永恒发展目标,因此我们应用建设组织机构、策划安全管理、安全监督检查等实践手段确保工业机电安装项目工程的有序安全开展。建设组织机构层面我们应创设全过程、全方位、全员参与的纵向到底、横向到边的安全管理工程体系,引入各职能机构部门参与,做到人人负责、人人有责的安全机构建设,令各岗位科学明确自身安全管理职责,并负责组织安全活动及日常安全生产管理。
策划安全管理阶段我们应科学编制分布、专项工程组织施工设计,对比较重要的安装发电机定转子、桥式超重机、主变压器等单项工程编制具体的施工措施与安全技术规划方案,进而由人员、制度、设备、材料、资金、技术与施工建设环境等层面作出最优化完善的安排与策划,确保工业机电安装工程的顺利实施。
为监督安全管理效果我们应全方位开展安全监察,尤其应对经常性吊装大件设备实施全面检查管理,核准吊装场地与机具是否包含不良安全隐患。为规范安全管理我们还应落实安全培训与交底,令参与施工的各专业普工、技工充分熟悉安全管理措施与必要的注意事项,通过开展定期安全培训提升项目工程安全管理水平。
六、工业安装机电项目工程成本管理
有效的成本管理可确保项目工程按计划工期顺利开展,因此我们应有效创建基于项目经理核心的控制成本体系,由合同预算单位负责控制成本与管理索赔工作。同时,我们应依据成本项目、工程部位实施成本计划制定,探寻控制成本的有效措施与途径,详细编制目标计划成本控制表与明细表,将具体责任落实到位,对控制成本方式、措施实施及时的整改与定期的检查。
我们还应依据工业安装机电项目的成本项目、工程部位创建收支成本明细表,逐项记录施工进程费用成本,并于每月实施一次结算,令其与目标计划成本实施分析、对比与综合评价。依据工业机电安装项目工程控制成本计划,各级管理人员可对需要用到的材料、人员、机械、设备等提前提出安排与计划,并由项目部统一对各生产要素进行精心策划、调度,做到全面优化配置、动态管理与合理应用,进而有效杜绝由于盲目调度或计划不周引发的窝工、停工、浪费、挤压与低效现象。
七、结语
市场经济的飞速发展、现代化科学技术水平的持续提升令工业工程项目建设规模日益扩大,为较好实现工业机电工程的良好安装,我们只有实施合理、有效、科学的工程项目管理,创设优质管理策略,才能显著提升工程建设水平,促进工业工程建设的全面持续发展。
参考文献:
[1]陆刚,郭玉军,薛长洁。 炼化工程机电安装要点及质量控制[J]。 中国化工装备,2012,(2)。
[2]刘延州。 炼化工程机电安装要点及质量控制[J]。 科技资讯,2012,(7)。