公务员期刊网 精选范文 工程经济合理性分析范文

工程经济合理性分析精选(九篇)

前言:一篇好文章的诞生,需要你不断地搜集资料、整理思路,本站小编为你收集了丰富的工程经济合理性分析主题范文,仅供参考,欢迎阅读并收藏。

工程经济合理性分析

第1篇:工程经济合理性分析范文

【关键词】深静脉血栓;肿瘤;预防

Uterine cancer complicated with acute lower limbs of deep vein thrombosis 40 cases clinical analysis

Huang xiao lan

【 Abstract】 objective: to study the clinical complicated the postoperative uterine cancer acute lower limbs of deep vein thrombosis reason, factors and treatment. Methods: in our July 2009 to December 2009 40 patients with uterine cancer complicated with acute lower limbs surgery deep vein thrombosis patients were retrospectively analyzed. Results: 40 cases of uterine fibroids for benign 36 cases of patients, uterine fibroids for patients with m alignant with 4 cases. All patients after color dopplar ultrasound tests identified, 40 cases of 39 cases were cured, a hospital deaths. Conclusion: surgical gynecological tumors especially womb cancer surgery complicating acute lower limb deep vein thrombosis, choose color dopplar ultrasound examination help acute lower limbs of deep vein thrombosis diagnosis. For whether acute lower limbs of deep vein thrombosis non-operative therapy or surgery are very effective, in the two methods of treatment combined with remove gathers, the anticoagulant treatment, the effect is good.

【Key words】Deep vein thrombosis; Tumor; prevention

【中图分类号】R385 【文献标识码】B 【文章编号】1005-0515(2011)07-0020-02

下肢深静脉血栓是妇科肿瘤特别是子宫癌手术后一种严重的并发症。据国外一些方面报道[2],妇科良性肿瘤手术后深静脉血栓的发生率较低,恶性肿瘤手术后深静脉血栓的发生率则达高达40%。特别是近年来据临床资料统计,妇科肿瘤尤其是恶性肿瘤手术后深静脉血栓的发生率越来越高。由于血栓形成可导致下肢功能障碍及肺栓塞,因而对于妇科肿瘤病人手术后深静脉血栓的预防和早期诊断治疗显得尤为重要。本文对我院2009年7月到2009年12月收治的40例子宫癌手术后并发急性下肢深静脉血栓病人,病情发生的原因、治疗方法和预防情况进行了总结,现把总结分析报道如下。

1临床资料和方法

1.1临床资料:40例子宫癌手术后并发急性下肢深静脉血栓病人,均为我院门诊住院病人。临床表现主要有:血像偏高,有不同程度的发热,充血,患肢肿胀增粗,不同程度疼痛,活动时加重。病来得急,年龄在43到65岁之间,平均年龄53岁。下肢疼痛的厉害且兼有稍微一按压就疼痛的现象。 40例中有31例患者左侧下肢发生下肢深静脉血栓,9例患者则发生在右下肢。19例患者实施非手术治疗,21例患者实施外科手术治疗。

1.2方法:除了临床症状和体征病史以外,全部通过彩超、CT检查确诊。治疗时让病人抬高患肢,以促进血液回流,减轻肢体的肿胀程度。两周时间内不能进行活动,避免血栓脱落引起肺栓塞,同时应用抗生素进行抗炎治疗。①手术治疗法。下肢深静脉血栓中用的最多,把左股静脉切开实施取栓手术,手术结束后要继续应用抗凝溶栓治疗。对于已经出现股青肿的患者,即便是病情时间长也要选择手术取栓,以尽量挽救患肢。②祛聚治疗法。祛聚的药物既能防止血小板的凝聚,又能降低血液粘稠度,稀释血液及扩充血溶量,成分主要为丹参,阿斯匹林和低分子右旋糖肝等,在临床上多数作为一种辅助疗法。③抗凝治疗法。抗凝剂主要有香豆素衍化物及肝素这两种,治疗时七到十天为一个疗程,并慢慢向口服抗凝药过度。出血是抗凝药物和溶栓最容易出现的并发症,而且使用剂每个人的个体差异性不同,一定要在医生的严密监护下应用。④溶栓治疗法。发病时间不超过三天,并且没有出血倾向的患者。

2结果

40例中39例治愈出院,一例死亡病例。29例患者进行溶栓治疗,应用尿激酶溶栓治疗,肝素抗凝辅助治疗,治疗结束五天后病人左下肢肿胀情况减轻明显,肢体功能也恢复到正常。11例患者实施手术后又选择抗凝祛聚进行辅助治疗两个月,以防止再次复发。手术后一到两周内临床症状明显得到改善,没有一例肺栓塞及新血栓形成。

3讨论

深静脉血栓形成指的是血液阻塞静脉腔,静脉回流时受到障碍,如果不及时进行治疗,会导致慢性深静脉功能不全,对生活和工作都会造成影响病情重的话还有可能致残。人体全身的主干静脉都有可能发病,临床上特别是下肢发病较多见。

3.1 ①子宫癌手术后并发急性下肢深静脉血栓原因和因素。子宫癌手术后并发D V T形成的三大主要因素是:血液处于高凝状态,静脉壁受到损伤,静脉血流速度变得缓慢。②妇科盆腔手术是下肢深静脉血栓形成的高危因素,因为麻醉后患者下肢肌肉处于松弛状态, 手术后要几天时间卧床休息,造成血流瘀滞不前,加上手术导致静脉壁损伤及有不同程度的感染。③血液浓缩是造成患者下肢深静脉血栓形成的根本原因。截止目前造成下肢DVT的因素主要有:应用激素替代治疗,长期口服避孕药,糖尿病,高血压,体重超标,静脉受损一直处于高凝状态,下肢静脉炎,恶性肿瘤及下肢静脉曲张。除此之外,据国内、外一些文献报道,恶性肿瘤释放的凝血活酶样物质,能促使血栓快速形成。

3.2 下肢深静脉血栓发生较多的部位。 本组31例患者左侧下肢发生下肢深静脉血栓,这和一些文献报道中左下肢深静脉血栓发生率远远高于右下肢相一致[4]。

3.3临床上DVT治疗的终极目的,就是防止血栓进一步扩展,以防血栓再次复发和留下后遗症及肺栓塞。治疗方面应依据病情的轻、重程度、发病时间的长短,再确定到底是选择手术,祛聚,溶栓还是抗凝方法进行治疗。

3.4 对下肢深静脉血栓进行预防的措施。主要从干预血流淤滞、静脉壁损伤及血液高凝状态三大危险因素入手,包括一般措施、机械及药物等预防。(一)一般预防:①加强高危人群的健康宣教,提高对DVT的认识。②密切观察病情变化,及早明确诊断,术前详细查体,常规化验血液流变学及凝血功能,有问题及时纠正或延缓手术。③创伤、术后长期卧床及制动的患者应指导并督促其早期进行主动或被动运动,活动量由小到大至回复正常,以促进血液循环,减少肺栓塞的发生,术后预防性应用活血、疏通微循环治疗。(二)机械及药物预防:最新ACCP抗栓和溶栓治疗指南指出了外科手术病人静脉血栓的预防措施,根据患者的年龄、手术的规模及危险因素(创伤、手术、制动、肥胖、心肺疾病、高龄、妊娠、分娩、吸烟、恶性肿瘤、化疗、口服避孕药、化疗、既往VET史、风湿免疫性疾病等)。

子宫手术后大约有16%的病人并发下肢深静脉血栓,因而针对极容易发生DVT、具有高危因素的病人,在手术前、后都要选择祛聚抗凝药物进行抗凝。手术结束后,护理人员要引导病人尽可能的早些在床上慢慢进行小幅度的下肢弯曲伸展活动,能早下床就早下床活动,以防术后形成静脉血栓。此外还有一些比如穿弹力袜,扎弹力绷带及对下肢进行按摩等物理性的预防方法,预防效果也不错。综上所述,科学正确的进行预防性的处理,能有效降低下肢深静脉血栓的发生率。

参考文献

[1] 韩素新,周剑利. 中西医结合治疗妇科肿瘤术后深静脉血栓临床分析[J]. 陕西中医, 2008, (07)

[2]冯书彬,徐文全. 恶性肿瘤与静脉血栓形成[J]. 山西医药杂志(下半月刊), 2008, (11)

[3]潘晓玉,卞美璐. 妇科肿瘤术后深静脉血栓和肺栓塞的防治[J]. 中国实用妇科与产科杂志, 2009, (07)

[4]王卿,罗开元,马春林. 恶性肿瘤伴发下肢深静脉血栓形成机制及治疗研究进展[J]. 医学 综述, 2009, (09)

[5] 崔雪梅. 子宫内膜癌复发的高危因素分析[J]. 中国医药导报, 2011, (06)

第2篇:工程经济合理性分析范文

关键词:焦化厂;建设项目;水资源论证

中图分类号:TV213.4

文献标识码:A 文章编号:1674-9944(2016)20-0091-02

1 引言

我国是世界上缺水最严重的国家之一。水资源是区域经济社会发展的基础性资源之一,也是区域生态与环境的控制性要素[1]。随着经济社会快速发展,人类对水资源的需求量不断增大,在多年的水资源开发利用中出现了含水层破坏、水位下降、水质恶化等一系列环境地质问题,严重制约了经济与社会的可持续发展,我国在建设项目中全面推行水资源论证,目的是保证建设项目的合理用水,提高水的利用效率和效益,更加合理地开发和使用水资源,加强保护水生态环境[2]。该建设项目位于唐山市丰南区黄各庄镇,对该焦化建设项目地下水水源年取水量98.0万m3/年的可行性进行论证,为建设项目取水许可审批提供技术依据。

2 建设项目概况

建设项目位于唐山市丰南区黄各庄镇,占地面积169.7亩;该建设项目为已建工程,于2005年8月全部投产,生产规模为年产焦炭65万t,焦油2.5万t。根据建设项目所在区域水资源条件,2005~2010年在无替代水源情况下开发利用深层地下水,2010年黄各庄镇污水处理厂建成后生产用水将以处理后的中水,生活用水采用城市供水管网中自来水。项目用水分为生产、生活用水,厂区生产、生活为一个给水系统,总用水量3164.7 m3/h,其中生产总用水量3160.8 m3/h,循环用水量3056.7 m3/h,新水用量111.9 m3/h,详见图1。取水水源采用深层地下水,取水地点位于厂区内部的3眼水井。

退水方案:项目排水系统分为生产、生活污水排水系统及生产清净下水排水系统。生产清洁排水为冷却循环排污水、软水站及制冷废水,污水排放量37.0 m3/h,排入厂区内生化处理装置,经生化处理后全部回用于熄焦,不外排。循环水系统排污水及软水站等排水经生产清净水排水系统收集后,全送至清净下水复用水系统,加压后复用。

3 论证等级和论证范围

该建设项目年取水98.0万m3/年,唐山市丰南区黄各庄镇地下水开发利用程度较高,论证范围内区域地质环境条件复杂程度为简单,本项目取水及退水对第三者用水影响轻微、对生态影响小,根据《建设项目水资源论证导则(试行)》(SL/Z3222-2005)规定,水资源论证工作等级由分类等级的最高级别确定,分类等级由地下取水、取水和退水影响分类指标的最高级别确定,最终综合确定本次论证工作等级为一级。

根据本次论证工作的任务,确定分析范围为丰南区行政范围及北部丰润区局部,面积1250.5 km2。由于丰南城区为主要地下水开采区,论证范围,主要为丰南镇、黄各庄镇及唐坊镇、南孙庄乡、丰润岔河镇、欢喜庄乡,面积约254.6 km2。

4 建设项目取用水合理性分析

4.1 建设项目取水合理性分析

按照国家产业政策的总体思路,该建设项目于2005年被国家发展改革委员会列入符合《焦化行业准入条件》的企业名单(第一批),从国家产业政策上讲,项目取水是合理的。

建设项目区域内地表水及中水已被规划利用,没有提供本项目的可利用量。

目前唐山市城市污水处理达到81.05%,中水项目逐步得到开发利用。丰南区政府正在丰南城区积极推进工业冷却用水使用中水,将逐渐减少对丰南区深层地下水的开采。建设项目所在区域农业开采层以浅层地下水为主,本建设项目取用深层地下水,从资源开发利用分析,取水基本合理。

4.2 建设项目用水合理性分析

本次论证中选取《河北省用水定额》中几个具有可比性的主要指标来衡量其用水的合理性,主要指标为:重复利用率、单位产品耗新水量及企业职工人均生活日新水量:工业用水重复利用率为96.7%,高于《节水型企业目标导则》规定的80%;单位产品耗新水量小于等于2.5 m3,符合清洁生产一级指标;企业职工人均生活日新水量为每人每天120 L,用水指标符合《河北省用水定额(试行)》河北省城镇生活用水定额表。综上所述建设项目在节水方面满足河北省行业要求,该建设项目用水量98.0万m3/年是比较合理的。

5 建设项目取水水源论证

5.1 取水可靠性与可行性分析

自从该井成井以来,水位与区域水位下降同步,说明水位基本稳定,主要受区域水位下降的影响,由于水源地附近工业企业较多,集中开采量大。根据预测结果,水源地目前水位埋深为44.7 m,开采量98万m3/年,水位降深16.2 m,水源地开采5年后(2010年)预测动水位埋深为67.81 m,项目取水对区域漏斗水位降深影响1.38 m。2010年使用中水后,水位下降会有所缓解,建设项目对水资源的需求是有保障的,能够满足111.9 m3/h的供水要求。

第3篇:工程经济合理性分析范文

【关键词】着色Petri网;跨组织工作流;工作流建模;合理性分析

一、引言

随着互联网的普及和电子商务的迅猛发展,市场竞争不再是单个企业之间的竞争,而是供应链甚至是价值链之间的竞争。因此传统的实现企业内部业务过程重组、过程管理与过程自动化的工作流建模技术已不再适用,跨组织工作流建模成为工作流研究领域的一个重要的新兴方向。本文通过对已有的跨组织工作流研究进行回顾,针对现有研究的不足和局限,并结合跨组织业务流程的特点,提出了基于着色Petri网的跨组织工作流协同建模方法,并对厂家线上直销这个典型的跨组织业务流程进行工作流建模与合理性分析。

二、文献回顾

跨组织工作流是指各个组织跨越组织边界进行内部业务流程的连接而形成的工作流集成架构,它与组织内工作流的最大区别在于它的跨组织边界性。Jiang(2008)等总结了跨组织环境下工作流的特征,即独立性与合作性并存、分散性与相关性并存及静态性和动态性并存。又由于组织间的合作形式不同,跨组织工作流也表现出不同的相互操作形式,Vander(2000)提出跨组织工作流的相互操作形式主要包括能力共享、链式执行、合同转包、事例转移及松散藕合,其中能力共享是唯一采用集中式控制的形式,其他均采用分散式控制,而且松散耦合具有很强的动态性,最适合跨组织情境下的流程实施。目前,跨组织工作流建模研究主要集中在建模方法和合理性分析两个方面,合理性分析的目的主要是保证跨组织工作流模型定义的正确性和跨组织工作流协作时的合理性。建模方法方面,Vander(1999)通过基于Petri网的建模方法,使用消息顺序图对跨组织的业务流程进行建模分析,验证了消息顺序图和跨组织商业过程是一致的,并确定了跨组织业务流程的最小需求。杜彦华(2008)等针对跨组织工作流协同时各个组织内部业务流程的隐私性和独立性不好,缺乏一定的灵活性和柔性等问题,提出了一种基于事件—状态—过程的跨组织工作流协同建模方法。钟晓雄(2010)等针对跨组织环境下的工作流形式化建模技术的不足问题,提出了一种基于Pi演算和EECA规则的跨组织工作流建模方法,此方法不仅可以有效地用于本地工作流间的协同工作,而且适合于对分布式协同环境下的工作流进行建模。

三、基于着色Petri网的跨组织工作流建模

(一)着色Petri网

着色Petri网(Colored Petri Nets,CPN)是具有层次性的高级Petri网。它是对经典Petri网的一种扩展,比经典Petri网多了一个要素——声明。声明可以用语言CPN ML来描述,在声明中定义了颜色集(类型)、函数、运算和变量。着色Petri网的着色主要是针对托肯和库所而言。通过对托肯着色,能够对托肯加以区分,从而在用着色Petri网建立的模型中表现出不同的资源(如不同身份的人员、不同类型的处理对象等);使得库所和变迁的数量都大为减少,图形更加简约;对库所的着色实际上是赋给库所一个颜色集,该颜色集限定了该库所中托肯所能取的颜色范围。而声明中定义的函数则可以用来反映出对不同色的托肯进行不同的业务流程处理。和程序设计语言相比较,就可以发现颜色集相当于程序设计语言中的类型,而托肯的颜色则相当于变量的取值。所以,有些情况下也把颜色集称之为类型。CPN的定义:CPN可以表示成九元组形式,即CPN=(Σ,P,T,A,N,C,G,E,I),其中Σ是颜色的非空有限集合;P为库所的有限集合;T为变迁的有限集合;A是有限弧集,且P∩T=P∩A=T∩A=ф;N:A(P×T)∪(T×P)是一个节点函数;C:(P∪T)Σss是颜色函数,其中Σss是Σ的有限子集;G是一个保护函数,映射T到布尔型表达式,使得■t∈T:Type(G(t))=B∧Type(Var(G(t))) Σ,其中B为布尔型数据,Type为类型函数,Var为变量的集合;E是一个弧函数,映射弧A到表达式,使得■a∈A:Type(E(a))=C(P)MS∧Type(Var(E(a)))

Σ,其中p是在N(a)中的库所,C(p)MS表示集合C(p)上的所有有限多重集的集合;I是一个初始化函数,映射P到不含变量的表达式,使得■p∈P:Type(I(p))=C(p)MS。

(二)实例分析

厂家线上直销是指客户通过网站直接向生产商下订单订购所需的商品,这是一个典型的跨组织业务流程,具体过程描述如下:客户根据自己的需求向生产商下订单,生产商接收到订单后查询客户所订购产品的库存,若库存数量大于订单数量则立即发货,小于的话需查询生产商的生产能力,若能力生产充足(即生产能力>(订单数量—库存数量)),则延迟发货,反之则告知缺货。根据着色Petri网的定义和性质对上述流程进行建模,得到下图所示的跨组织工作流模型(左边是客户工作流模型,右边是生产商工作流模型)。

上图中库所P、变迁T、颜色集C的具体含义如下表所示:

通过绘制可达图对所建立的工作流模型进行进一步的合理性分析,但由于可达图的结构庞大,对模型进行合理性分析时只考虑商品种类和数量。因此假设当前客户需要定制8件A商品,5件B商品,6件C商品;目前生产商库存中只有10件A商品,另外在客户规定的时间内生产A商品的能力为5件,生产B商品的能力为6件,生产C商品的能力为5件。显然,生产商只能满足商品A和B的要求。根据以上假设,构造出图1所示模型的部分可达图如图2所示:

从图2所示的可达图可以得出如下结论:(1)模型具有可达性。从初始状态开始,总能到达流程的终止状态。在终止状态,表示输出的库所P4中有标记,而且除表示某种商品库存数量和一定时间内某种商品的生产能力的库所P12与P13外,其余库所中的标记均为0。因此,对于所给的任务,沿着着色Petri网的适当路径均可以执行;(2)模型是有界的。可达图中的任何节点都没有未知数的出现;(3)可达图中不存在死锁,该模型具有活性;(4)可达图可以覆盖模型中的每个状态,所以该模型具有可覆盖性。

综上分析,本文设计的工作流模型具有可达性、有界性、活性及可覆盖性的特点,因此该工作流模型是合理的。

四、结论与展望

本文基于着色Petri网对厂商线上直销这个典型的跨组织业务流程进行建模,并对所建立的模型进行合理性分析,一方面克服了其他建模方法(如传统的Petri网)无法对复杂的跨组织工作流进行有效地描述的缺点,另一方面引入颜色集,有效地降低模型的复杂性,使模型更加简约清晰。因此着色Petri网在对复杂的跨组织业务流程建立工作流过程模型方面有着很大的优越性。但是本文在建模过程中未引入时间的约束,使得模型不够精确,未能对模型进行性能分析;而且本文的跨组织工作流模型只包括两个组织,各个组织内部的流程也比较简单,需要进一步对流程进行细化和完善。这些都是今后的研究需要改进的地方。

参 考 文 献

[1]Jiang P,Shao X,Qiu H,Li P.Interoperability of cross-organizational

workflows based on process view for Collaborative product development[J].Concurrent Engineering.2008,16(1):73~86

[2]Vander.Loosely coupled cross-organizational workflows:modeling and

analyzing workflows crossing organization boundaries[J].Information and

Management.2000,37:67~75

[3]Vander.Process-oriented architecture for electronic commerce and

cross-organizational workflow[J].Information Systems.1999,24(8):639~671

[4]杜彦华,范玉顺.基于事件-状态-过程规则的跨组织工作流协同方法[J].计算机集成制造系统.2008,14(7):1342~1348

[5]钟晓雄,张远平.基于Pi演算和EECA规则的跨组织工作流建模研究[J].计算机工程与设计.2010,31(17):3831~3834

第4篇:工程经济合理性分析范文

1.1拟定工程任务

拟定工程任务是为工程定位服务功能。分析论述各用水对象的必要性、紧迫性、可行性、经济性及社会效益等,并与业主沟通后,合理确定工程任务。通过现场踏勘和基础资料收集,分析受水区域或受水对象现状取用水情况及缺水情况,论证各用水对象的取用水的必要性、紧迫性、可行性、经济性及社会效益等,最终确定工程任务。

1.2需水预测

1.2.1城镇需水预测城镇用水主要包含城镇居民生活用水、三产用水、建筑业用水、道路洒水及绿化用水等。先统计出现状水平年受水区域的人口及社会经济情况,根据城市总体规划和当地社会经济发展规划预测设计水平年受水区域的人口及社会经济发展情况,再根据相关规范及地方行业标准确定各行业用水定额,计算各行业设计水平年需水量。在城镇需水预测中,应考虑管网损失和未预见水量。

1.2.2工业需水预测由于工业的快速发展,对水资源的需求愈来愈大,工业需水往往是某城市、区域的用水大户,所以,工业需水预测的合理性亦显重要。工业需水预测方法一般有4种,一是万元增加值(生产总值)用水量法,二是占地预测法,三是现状用水量调查法,四是类比法。万元增加值(生产总值)用水量法是根据受水区工业用水对象的类别、产业结构等合理确定万元增加值(生产总值)设计水平年的用水定额,再根据该工业园区规划资料确定其设计水平年的增加值(生产总值),或根据相关资料预测设计水平年的增加值(生产总值),最后计算得到设计水平年的需水量。占地预测法是先确定工业用地类别(工业用地类别分为一、二、三类工业用地),再根据相关资料确定设计水平年各类别用地占地面积,最后确定设计水平年的需水量。现状用水量调查法主要是针对受水区工业发展相对成熟,且设计水平年工业规模有所调整的情况。这种情况先进行现状用水调查,考虑设计水平年工业规模的变化情况,同时考虑节水和未预见情况,最后合理确定设计水平年的需水量。类比法是类比临近地区同类型工业的现状和设计水平年的取用水情况,再考虑工业的规模情况,合理得到设计水平年的需水量。需要指出的是,在进行工业需水预测时,应考虑工业用水重复利用情况;在进行工业需水预测时尽量采用多种方法进行预测,并对比分析各种方法的成果,合理确定工业需水量。

1.2.3灌溉需水预测灌溉用水量是国民用水对象中第一用水大户,其用水量占国民总用水量70%以上,所以,在以灌溉为主的工程中,灌溉需水预测尤为重要。灌溉需水预测主要是先通过现场踏勘情况和相关规划,确定灌溉面积、灌溉制度、灌溉方式、种植结构及复种情况等,再通过当地的降水及蒸发资料计算各种植物的灌溉定额,最后根据管道(渠道)的输水情况及田间水利用情况确定灌溉用水量。需要指出的是各种植物的灌溉定额要与地方(区域)行业用水定额相符合;由于各用水对象的设计保证率不尽相同,兴利调节计算时应考虑灌溉削减。

1.2.4农村人畜需水预测农村人畜需水预测主要是根据《村镇供水工程技术规范》(SL310-2004)进行预测。先进行设计水平年的人口(牲畜)数量预测,再根据受水区所属分区和用水对象的用水条件拟定设计水平年的用水定额,最后计算出设计水平年农村人畜需水量。

1.2.5生态需水预测水利工程规划设计中生态需水分为河道内生态需水和河道外生态需水,河道外生态需水主要包含道路广场洒水及绿化用水等,此部分水量已经包含在城镇用水中,此处的生态需水主要是指河道内生态需水。河道内生态需水主要是指为了满足某河道(河段)某种特定的功能所需要的最小水量(流量),其主要控制指标是流量和水位。如为了满足某瀑布景观要求,在瀑布上游修建蓄水工程,通过蓄水工程调蓄水量,使下游瀑布在枯期也能有较大水量满足旅游者的视角感官要求。又如在某河流的某河段有较珍贵水生动物,若河道流量(水位)低于某值时,该水生动物不能生存,这也需要在上游河段修建蓄水工程,通过蓄水工程调蓄水量,使枯期也能有较大的水量满足其生存要求。

1.2.6发电用水水利工程的电站主要是坝后电站,主要是用蓄水工程的弃水和环境水发电,若水源工程高程较高,也有用调节后的供水、环境水及弃水发电。用于发电用水不耗水,水利工程中一般不进行发电需水预测。

1.2.7需水成果合理性分析为了评价需水预测成果合理性,要进行必要的合理性分析,分析方法主要用单位人口及单位占地用水量评价,同时类比临近或省内外类似工程,评价需水预测成果的合理性。

2供需平衡分析

分项需水预测后,得到总需水量。通过全面收集资料,系统复核现有水源工程可供水量;根据相关资料进行节水规划、治污规划及中水利用规划,得到设计水平年的中水利用量;同时考虑在建工程和规划工程供水能力后,得到受水区的缺水量。再考虑水厂自用水和管道(渠道)输水损失后得到水源取水口处的需水量。

3工程规模特征参数比选

工程规模特征参数比选是多个专业共同协作的过程,但规划专业起到组织、引领及决定作用。工程规模特征参数比选过程在规划中也不是独立的过程,它和拟定工程任务、需水预测、供需平衡分析等过程一起组成反复的迭代过程。迭代的结果反映了工程的必要性、紧迫性、可行性、经济性及社会效益等,迭代的结果就是反映工程最终规模。

4规划工作详解

4.1规划工作的难点

规划工作的难度主要体现在基础资料收集、整理及工程规模特征参数比选上,工程规模越大,受水区越大,资料收集和整理的难度越大。目前水利基础设施建设处于一个相对高的水平,水资源开发利用程度达到了以往任何时期都未达到的程度,往往一个工程的受水区与另外一个或几个工程的受水区交叉,这就给规划专业资料收集和整理造成了很大的难度。另外一方面,规划专业的难点在于工程规模特征参数比选上,比选过程反映了复杂性、冗长性、迭代性等特征。

4.2规划工作的作用

可以说一个水利工程能否上马以及工程规模的大小都与规划工作息息相关。一个水利工程能否上马主要看工程建设的必要性、紧迫性、可行性、经济性及社会效益等,而这些都是规划专业工作的主要内容,好的规划往往起到推动项目的进程,把工程的必要性、紧迫性、可行性、经济性及社会效益等论述、包装得淋漓尽致。一个工程的规模大小受受水区的需水要求影响,而规划工作的核心正是需水预测,需水预测成果合理性直接影响工程规模的合理性。所以,规划工作在水利工程的前期工作中的地位是非常重要的,不可替代的。

5结语

第5篇:工程经济合理性分析范文

关键词: 建筑设计; 经济; 合理性; 控制;

Abstract: the great human resource input in building economy to request, but also of the architecture design of the proposed economic rationality requirements. Architectural design is reasonable in economy, that is applicability, economy, safe, beautiful "principle request, with a relatively small input to get as much economic interests, or in the same labor cost, obtain the best use effect, make a building designed to achieve applicability, economy, artistic harmonious and unified. This article mainly from the value of the building design idea of economy, analysis and study of the architectural design economic goals and economic conditions on its conditionality, analyzes the impact of architectural design economic rationality of various factors, and put forward effective management and control architecture design some countermeasures of economic rationality.

Keywords: architectural design; Economy; Rationality; Control;

中图分类号:S611文献标识码:A 文章编号:

前言

人类的建筑活动是社会经济生活中不可或缺的内容。工业社会以来,建筑发展构成了社会经济进步的重要动因,但在发展过程中对社会资源的消耗,又使之成为当代能源危机的重要根源之一。因此,建筑发展的可持续性日益受到人们的关注。提倡“经济”的主旨是指行对建筑作品的优化、保障社会资源的充分合理利用,以求建筑作品的最大经济价值,不仅是评判建筑设计作品优劣的重要尺度,而且也是能否促进国民经济合理发展的关键环节。建筑设计是一个复杂的综合系统, 在其不同工作阶段, 无论是建筑的前期工作、建筑方案设计, 还是建筑技术设计深化阶段, 都始终贯穿着经济合理性这一理念。

一、建筑设计合理性的内涵分析

从最原始的穴居到当今的高楼大厦, 人类的建筑活动始终受到经济条件的强大制约作用。因为不论建筑等级的高低, 不论规模大小, 不论形式如何, 都离不开人力资源和物质资源的支撑, 而这些资源又离不开经济条件的制约。建筑设计也就必然存在着经济的制约性。建筑巨大的物质消耗在对建筑合理性提出要求的同时,也对建筑设计提出了合理性的要求,使建筑设计在经济条件的制约下进行。但是,建筑可以通过有效的设计方法,在建筑的总体布局、空间组合和技术选择等方面进行优化设计,以有限的经济条件达到建筑的建设要求,或在限定的经济条件下创造出较多的使用价值。因此,全面地分析建筑消耗、合理平衡建设成本和消费成本是提高建筑合理性的关键。

二、建筑设计要达到的经济目标分析

建筑设计的目标是一个多元化的目标体系, 包含有功能目标、技术目标、经济目标、社会目标、生态目标、环境目标等。在这些目标之间, 存在着相互关联、相互制约、相互协调、平衡发展的基本关系。建筑设计的经济合理性是建筑设计中应遵守的一项基本原则, 同时也是建筑设计中要同时达到的目标之一, 即经济目标。由于建设可用资源的有限性, 这就要求我们对建设投资进行合理的分配和高效利用, 同时建立可持续发展观。因此, 建筑设计工作者要根据社会生产力的发展水平, 国家经济的发展状况, 人民生活的现状等因素, 确定建筑的合理投入和建造所要达到的建设标准, 以求在建筑设计中做到以最小的投入去获取最大的经济和使用效益。

三、影响建筑设计经济合理性的因素分析

1、设计思想陈旧, 设计中的错、漏、补, 使工程造价出现“三超”现象, 即概算超估算, 预算超概算, 决算超预算。这主要是由于有些设计人员知识更新慢, 不了解飞速发展的建筑科技的最新趋势, 设计理念落后, 对新材料、新工艺、新技术更是缺乏认识, 选用过时的材料和设备。有的则是设计中的错误在施工过程中才暴露出来, 只能进行变更、修改、补充设计, 有的甚至发生事故, 造成返工或产生更严重的后果。

2、设计华而不实, 忽视适用、经济、美观的原则, 片面追求奇、异、怪。现在设计领域存在一味追求形式, 不求功能适用性和经济合理性, 过分讲究高档奢华的个别现象, 这是一种不正常的现象, 同时, 也是一种不负责任的表现。例如: 一些住宅小区中不论高层、低层都在顶部设计好多无用的所谓装饰“飘件”, 既不美观又不经济实用。还有一些住宅楼, 为追求所谓立面效果, 用大面积的玻璃幕墙把阳台、卧室的窗户加以封闭, 这样, 不但破坏了阳台的功能, 不利于居室的自然采光和通风, 又造成了不必要的浪费。

3、工程技术与经济观念相分离。我们有些工程技术人员的技术水平、工作能力并不差, 但是他们缺乏经济观念, 导致设计思想保守, 认为降低投资成本是业主的事, 是财务人员的职责, 与己无关。有的不进行方案比较和优化, 拿单一方案一画了事。有的虽作比较也只是注重立面造型而不注重经济方面的分析比较, 这样以来, 建筑设计的经济合理性就很难做到。

4、相关政府部门对设计的审查、监督不到位。有关主管部门对设计图纸审查, 大都注重技术性而忽视经济合理性, 甚至个别地方领导不听取专家意见, 仅凭一张花里胡梢的效果图和个人的喜好就“一锤定音”, 造成好多工程建成后既不适用又不经济, 有的实际效果也并不美观。这也在一定程度上对设计市场产生了误导作用。

四、建筑设计经济合理性的有效管理措施分析

工程建设, 设计为先。要想控制好建筑经济方面的问题, 应该从建筑设计阶段就开始实施建筑经济管理。这是因为设计阶段是影响项目投资最大的阶段。而长期以来, 我国普遍忽视工程建设项目前期设计阶段的经济合理性控制, 而往往把控制工程造价的主要精力放在施工阶段, 这样做尽管也有效果, 但毕竟是“亡羊补牢”, 事倍功半。要有效地控制工程造价, 就要抓住建筑设计这个关键环节。加强建筑经济管理与控制, 可采取以下几个方面的措施:

1、做好项目可行性的研究工作。依据投资限额底线, 要求各建设单位和设计单位对设计方案尽量优化, 在确定投资决策后, 最大幅度的节约投资, 降低工程造价, 把建筑经济评价作为项目可行性研究的核心。

2、全面提高工程设计人员的素质。要从加强设计人员的道德教育入手, 以设计人员的业务培训和知识更新为重点, 大胆运用成熟的先进技术, 先进工艺和新型的建材, 充分发挥经济技术人员在设计中的作用。

3、加强图纸会审工作。加强图纸会审, 将工程变更的发生尽量控制在施工之前。在设计阶段, 克服设计方案的不足或缺陷, 所花费的代价最小, 可取得的效果最好。我们在设计出图前, 组织总工办、工程部、资产经营部, 对图纸技术上的合理性、施工上的可行性、工程造价上的最经济性进行审核, 从各个不同角度对设计图纸进行全面的审核管理工作, 以求得提高设计质量, 避免因设计考虑不周或失误给工程项目造成不必要的经济损失。

4、充分发挥竞争机制和风险机制在设计中的作用。以开发设计方案招标和方案竞赛的形式, 改革过去指令性的设计方式, 引用竞争机制, 真正使设计方案得到优化。注安全适用、经济合理、造型美观、技术先进的设计标准。运用风险机制改革设计质量好坏对设计人员并无直接经济利害关系的状况, 对因设计质量好, 工程造价低的要给予奖励, 对因设计质量造成损失的要重罚。

5、广泛推行限额设计。 项目设计的优劣将直接影响建设费用的多少和建设工期长短, 同样也影响建设项目以后的使用价值和经济效益。作为设计单位, 在设计中凡是能进行定量分析的设计内容, 均要通过计算, 要用数据说话, 充分考虑施工的可能性和经济性。

五、结语

建筑设计是一个综合的系统工程,在不同的工作阶段,无论是建筑的前期策划、方案构思、还是方案设计以及技术深化的阶段,始终都贯穿着合理性的理念。这就要求建筑设计师必须从当今经济现状及发展趋势出发,建立宏观的合理性理念,合理地确定各种条件下的建筑设计标准,总结各项合理性措施,在达到建筑建设要求的基础上,利用有限的资源获得尽可能多的效益,重视建筑设计中的经济理念, 实施对建筑设计优化, 保障社会资源的充分合理利用, 以求建筑作品的最大经济价值。根据社会主义市场经济发展的需要, 使建筑设计达到适用性、经济型、艺术性的协调统一。

参考文献:

[1]吴博:建筑设计中地方风格与追崇主义之间的矛盾关系[J].技术与创新管理,2009,30 (4)

[2]王立:浅析“适用、经济、美观”在当今国内建筑设计中的理解[J].甘肃科技,2007,23 (4)

[3]曾春雷:建筑设计中的经济和逻辑思维[J].中国住宅设施,2009,(9)

第6篇:工程经济合理性分析范文

【安防监控系统项目申请报告价值体现】

《安防监控系统项目申请报告》基于国家宏观政策规划、国家和地方中长期规划、产业政策,分析项目设立的政策背景,根据主要工艺和装置的技术资料拟定项目技术方案,根据项目涉及资源情况拟定资源利用方案,根据项目所在地环境现状及国家、地方环保法规拟定环保方案,根据国家和地方社会、经济发展现状作出社会、经济影响评价意见,是专门针对安防监控系统项目编制的专业申报文件,该报告的核心价值是:

——作为项目主审机构批复项目执行的依据;

——作为项目后期开展编制其他论证文件的依据;

——作为企业执行项目后期工作的依据。

【安防监控系统项目申请报告质量保障】

广州中撰企业投资咨询有限公司是由5名资深投资策划专家和产业经济竞争情报研究实战派人士共同打造的专业投资项目咨询机构。我们的远景是成为中国最大、最专业的产业投资信息收集(研究+传播)及投资项目咨询策划机构,能够有效地为客户提供项目专项咨询服务,研究院成员长期的项目咨询经验可以保障《安防监控系统项目申请报告》的质量。

一、安防监控系统项目总论

(一)安防监控系统项目背景及安防监控系统项目概况

(二)安防监控系统项目承担企业产品质量、技术水平、生产能力、生产工艺及装备现状,与国内外先进水平的比较

(三)安防监控系统项目建设必要性

二、安防监控系统项目发展规划、产业政策、行业准入和市场分析

(一)发展规划、产业政策、行业准入分析

(二)市场分析。包括产品市场供需分析、市场竞争力及风险分析

三、建设规模与产品方案

(一)建设规模(包括产能等)

(二)产品方案(主要产品种类、产量、质量和技术水平)

四、安防监控系统项目厂址选择及用地方案

(一)厂址现状及建设条件、用地方案

(二)现有场地利用情况

(三)土地利用合理性分析

五、安防监控系统项目技术方案、设备方案和工程方案

(一)主要设备方案

(二)工程方案

(三)技术方案、生产工艺流程及装备水平

(四)安防监控系统项目招标内容(适用于申请专项资金100万元及以上的投资安防监控系统项目)

六、安防监控系统主要原材料供应、资源开发及综合利用分析

(一)主要原材料供应

(二)资源开发和利用方案

(三)资源节约措施

七、总图、运输与公用辅助工程

(一)总图布置

(二)场内外运输

(三)公用辅助工程

八、节能措施

(一)能耗状况和能耗指标分析

(二)节能措施和节能效果分析

九、环境影响分析

(一)厂址环境条件和现状

(二)安防监控系统项目建设和生产对环境的影响

(三)环境保护措施方案

(四)环境保护投资

(五)环境影响评价

十、劳动安全卫生与消防

(一)危害因素与危害程度

(二)安全措施方案

(三)消防设施

十一、投资估算及资金筹措

(一)投资估算表

(二)资本金筹措

(三)债务资金筹措

(四)申请专项资金的主要原因和政策依据

十二、财务分析及评价结论

(一)不确定性分析

(二)财务评价结论

(三)安防监控系统项目风险分析

十三、经济和社会影响分析

(一)从优化产业结构和提升竞争力、改变经济增长方式、资源综合利用、改善环境以及循环经济等方面,分析安防监控系统项目的影响

(二)安防监控系统项目对社会的影响分析

(三)安防监控系统项目与所在地互适性分析

(四)社会评价结论

十四、安防监控系统项目进展情况

第7篇:工程经济合理性分析范文

1、项目申报单位概况。包括项目申报单位的主营业务、经营年限、资产负债、股东构成、主要投资项目、现有生产能力等内容。

2、项目概况。包括拟建项目的建设背景、建设地点、主要建设内容和规模、产品和工程技术方案、主要设备选型和配套工程、投资规模和资金筹措方案等内容。

第二章 发展规划、产业政策和行业准入分析

1、发展规划分析。拟建项目是否符合有关的国民经济和社会发展总体规划、专项规划、区域规划等要求,项目目标与规划内容是否衔接和协调。

2、产业政策分析。拟建项目是否符合有关产业政策的要求。

3、行业准入分析。项目建设单位和拟建项目是否符合相关行业准入标准的规定。

第三章 资源开发及综合利用分析

1、资源开发方案。资源开发类项目,包括对金属矿、煤矿、石油天然气矿、建材矿以及水(力)、森林等资源的开发,应分析拟开发资源的可开发量、自然品质、赋存条件、开发价值等,评价是否符合资源综合利用的要求。

2、资源利用方案。包括项目需要占用的重要资源品种、数量及来源情况;多金属、多用途化学元素共生矿、伴生矿以及油气混合矿等的资源综合利用方案;通过对单位生产能力主要资源消耗量指标的对比分析,评价资源利用效率的先进程度;分析评价项目建设是否会对地表(下)水等其它资源造成不利影响。

3、资源节约措施。阐述项目方案中作为原材料的各类金属矿、非金属矿及水资源节约的主要措施方案。对拟建项目的资源消耗指标进行分析,阐述在提高资源利用效率、降低资源消耗等方面的主要措施,论证是否符合资源节约和有效利用的相关要求。

第四章 节能方案分析

1、用能标准和节能规范。阐述拟建项目所遵循的国家和地方的合理用能标准及节能设计规范。

2、能耗状况和能耗指标分析。阐述项目所在地的能源供应状况,分析拟建项目的能源消耗种类和数量。根据项目特点选择计算各类能耗指标,与国际国内先进水平进行对比分析,阐述是否符合能耗准入标准的要求。

3、节能措施和节能效果分析。阐述拟建项目为了优化用能结构、满足相关技术政策和设计标准而采用的主要节能降耗措施,对节能效果进行分析论证。

第五章 建设用地、征地拆迁及移民安置分析

1、项目选址及用地方案。包括项目建设地点、占地面积、土地利用状况、占用耕地情况等内容。分析项目选址是否会造成相关不利影响,如是否压覆矿床和文物,是否有利于防洪和排涝,是否影响通航及军事设施等。

2、土地利用合理性分析。分析拟建项目是否符合土地利用规划要求,占地规模是否合理,是否符合集约和有效使用土地的要求,耕地占用补充方案是否可行等。

3、征地拆迁和移民安置规划方案。对拟建项目的征地拆迁影响进行调查分析,依法提出拆迁补偿的原则、范围和方式,制定移民安置规划方案,并对是否符合保障移民合法权益、满足移民生存及发展需要等要求进行分析论证。

第六章 环境和生态影响分析

l、环境和生态现状。包括项目场址的自然环境条件、现有污染物情况、生态环境条件和环境容量状况等。

2、生态环境影响分析。包括排放污染物类型、排放量情况分析,水土流失预测,对生态环境的影响因素和影响程度,对流域和区域环境及生态系统的综合影响。

3、生态环境保护措施。按照有关环境保护、水土保持的政策法规要求,对可能造成的生态环境损害提出治理措施,对治理方案的可行性、治理效果进行分析论证。

4、地质灾害影响分析。在地质灾害易发区建设的项目和易诱发地质灾害的项目,要阐述项目建设所在地的地质灾害情况,分析拟建项目诱发地质灾害的风险,提出防御的对策和措施。

5、特殊环境影响。分析拟建项目对历史文化遗产、自然遗产、风景名胜和自然景观等可能造成的不利影响,并提出保护措施。

第七章 经济影响分析

1、经济费用效益或费用效果分析。从社会资源优化配置的角度,通过经济费用效益或费用效果分析,评价拟建项目的经济合理性。

2、行业影响分析。阐述行业现状的基本情况以及企业在行业中所处地位,分析拟建项目对所在行业及关联产业发展的影响,并对是否可能导致垄断等进行论证。

3、区域经济影响分析。对于区域经济可能产生重大影响的项目,应从区域经济发展、产业空间布局、当地财政收支、社会收入分配、市场竞争结构等角度进行分析论证。

4、宏观经济影响分析。投资规模巨大、对国民经济有重大影响的项目,应进行宏观经济影响分析。涉及国家经济安全的项目,应分析拟建项目对经济安全的影响,提出维护经济安全的措施。

第八章 社会影响分析

1、社会影响效果分析。阐述拟建项目的建设及运营活动对项目所在地可能产生的社会影响和社会效益。

2、社会适应性分析。分析拟建项目能否为当地的社会环境、人文条件所接纳,评价该项目与当地社会环境的相互适应性。

第8篇:工程经济合理性分析范文

第申报单位及项目概况

1.项目申报单位概况。主要包括项目申报单位的重点经营范围、资产负债情况、股东构成及股权结构比例、以往投资类似项目的简要情况等内容。

2.项目概况。主要包括项目建设地点、建设内容及规模、产品及技术方案、主要设备选型、投资规模、资金筹措方案等。

产业政策及行业准入

1.拟建项目与相关规划的关系。

2.拟建项目与相关产业政策的关系。

3.拟建项目与相关行业准入标准的关系。

项目选址及土地利用

1.项目选址及用地方案。主要包括项目用地选址、场址土地权属类别及占地面积、土地利用现状及相关规划情况、占用耕地概况、土地获取方式等。

2.土地利用合理性分析。主要分析是否符合土地利用总体规划、占地规模是否合理、耕地占用补充方案是否可行等。

3.地质灾害影响分析。对于在地质灾害易发区建设的项目和易诱发地质灾害的项目,应阐述项目选址所在地的地质灾害情况,分析拟建项目诱发地质灾害的可能性。

4.其他不利影响。分析拟建项目是否压覆矿床和文物,是否会对防洪和通航等产生不利影响。

资源开发及综合利用

1.资源开发方案。对于资源开发类项目,阐述资源储量和品质勘探情况,分析拟开发资源的可开发量、自然品质、赋存条件、开发价值等,评价是否符合资源总体开发、综合利用和可持续发展的要求。

2.资源利用方案。主要包括项目需要占用的重要资源品种、数量及来源情况,资源节约及综合利用方案,单位生产能力主要资源消耗量指标及与国内外相关资源利用效率的对比分析。

3.节能及节水措施评价。对项目建设方案的能耗及水耗指标进行分析,阐述工程建设方案是否符合节能及节水政策的有关要求,在提高能源及水资源利用效率、降低能耗和水耗等方面的对策。

征地拆迁及移民安置

1.城市居民搬迁方案。涉及城市征地拆迁的项目,应根据项目建设方案,进行征地拆迁影响的调查分析,提出拆迁补偿的原则、范围和方式,并以是否符合国家相关政策法规要求进行评价。

2.农村移民安置方案。涉及农村征地及移民安置的项目,应根据项目建设方案,进行项目征地影响的相关调查分析,提出移民生产开发、生活安置、征地补偿、收入恢复等方案,并进行可行性分析论证。

环境和生态影响分析

1.环境和生态现状。包括项目场址的自然环境条件、现有污染物情况、生态环境条件、特殊环境条件及环境容量状况等。

2.项目对生态环境的影响。包括污染物类型、排放量情况,对生态环境的影响因素及影响程度,是否符合环保法规要求,对流域和区域环境及生态系统的综合影响。

3.生态环境保护对策。按照国家有关环保法规要求,对环境影响治理方案的工程可行性进行分析,对可能造成的生态环境损害提出对策建议。

4.特殊环境影响。项目对历史文化遗产、自然遗产、风景名胜和自然景观等的影响及对策。

经济影响分析

1.国民经济评价。按合理配置资源的原则,从国民经济的角度考察投资项目所耗费的社会资源和对社会的贡献,评价投资项目的经济合理性。

2.区域经济影响分析。对于区域经济影响较大的项目,从区域经济发展、产业布局及结构调整、区域财政收支、收入分配及是否可能导致垄断等角度进行分析。

3.经济安全分析。对于涉及国家经济安全的项目,从产业技术安全、资源供应安全、资本控制安全、产业成长安全、市场环境安全等角度进行分析。

社会影响分析

1.系统调查和预测拟建项目的建设、运营对项目所在地区可能产生的社会影响与社会效益。

2.分析预测项目能否为当地的社会环境、人文条件所接纳,以及当地居民支持项目存在与发展的程度,考察项目与当地社会环境的相互适应关系。

第9篇:工程经济合理性分析范文

【关键字】工程造价分阶段控制

中图分类号: TU723.5 文献标识码: A 文章编号:

一、建设项目决策阶段如何控制工程造价

建设项目决策是选择和决定投资方案的过程,这一过程非常重要。它是建筑的龙头,要及时对不同的方案进行技术经济比较,做出正确的判断和决策。在判断与决策的过程中,要抓住方案的两个因素,成本与规模。作为建设方,这一过程直接会影响到以后阶段的建设项目的投资控制。建设单位要对与拟建项目有关的社会、经济、技术等各方面进行深入调查研究,对各种可能采用的技术方案和建设方案进行认真的技术分析和论证,对项目建成后的经济效益进行科学的预测和评价。

二、 建设项目招标和签约阶段如何控制工程造价

在项目实施过程中,认真编制招标文件及签订工程合同尤为重要,如何把握好招标过程和合同的策划是一项重要的工作,根据调研的结果和多年的工作经验,需要注意以下事项:一是,实行无标底招标;二是,招标方式的确定;三是,保函或保证金的应用;四是,报价形式的选择;五是,拟签约的承包商数量和发包方式的确定;六是,重要合同条款的确定;七是,合同价格形式的确定。

三、 建设项目施工阶段如何控制工程造价

施工阶段是落实合同、实施投资控制的操作过程,是工程设计意图最终实现并形成工程实物的阶段,由于施工过程周期长,影响因素多,应采取有效的措施加强这一阶段的投资控制,对管好用好资金,提高投资效益具有重要的意义。

1. 施工阶段存在的问题:首先,施工单位建筑工程造价的控制目标制定不合理,缺乏科学性和先进性;其次,材料价格管理方法落后,材料采购、储存量计算不科学,不能很好地掌握采购时机,由于建筑市场目前还比较混乱,材料采购价格失真,不法分子从中渔利,也使得占建安工程成本 60%——70%的材料费用失去控制;再次,施工组织方面,多数施工企业还一直沿用老办法,现有的人、财、物没能得到合理配置与利用,造成大量浪费,从而导致工程造价提高。

2. 施工阶段的工程造价控制

(1)工程项目实施阶段项目管理方式的策划。项目管理方式的合理选择是控制工程质量、进度、投资三大目标的主要保证。熟悉设计图纸和设计要求,对可能出现的工程费用变化大的部分和环节,作为重点造价控制对象。

(2)造价工程师对项目实施过程进行全面跟踪,对经济技术变更及时进行经济技术比较,并进行预测和分析,严格控制工程变更。施工前,要组织施工人员到现场踏勘,并对图纸进行会审、技术交底,避免施工中出现不应有的返工,特别是那种涉及费用较高的设计变更,必须经设计单位、建设单位现场代表、监理公司、施工单位等几方在现场核实并进行技术及经济比较,尽量减少合同外费用。

(3)把好施工组织设计和施工方案的审核关,合理开支施工措施费,以及按合理工期组织施工,避免不必要的赶工费,因设计变更或漏项而造成人力、物资、资金的损失和停工待图、工期延误、构件物资积压、改换代用以及连带发生的其它损失:按图施工后发现设计错误或有缺陷,经业主同意采取补救措施进行技术处理所增加的额外工程费用:新型特种材料和新型特种结构的试制、试验所增加的费用。加强设计审查,控制设计变更。通过对设计方案(含材料)和施工方案的技术经济比较,选择最佳方案,工程变更、设计修改要慎重,事前应进行技术、经济合理性分析,防止返工等索赔事件发生。

四、建设项目竣工结算工程造价控制

在结算审查过程中,正确处理审查方与被审查方的关系,保证工程结算工作顺利开展。首先应认真熟悉图纸,分析竣工资料,核实工程数量,对于未做的工作内容在结算时应予扣除。审查现场签证的真实、合理性。审查签证单的内容与设计图纸、定额中所包含的内容是否重复,对于重复的项目及内容必须予以剔除。做好施工材料的审查工作,为整体控制奠定基础。

进一步来看,应严格审查施工合同,正确处理结算纠纷。审查施工合同及有关文件的工作为:核准工程结算范围,确定施工期,正确进行索赔。确定施工承包方式以及审查合同其它条款的落实情况,尤其注意审查定额使用、政策调整的合理性、准确性,是否按规定的工程量计算规则计算工程量等几方面工作。同时,认真做好工程材料价款的结算审查,纠正单纯靠材料购货发票作为工程结算材料调价依据的作法,审查是否按规定计算材料差价,以及是否存在施工单位将建设单位委托购买的材料列入工程结算。最后,关注各项取费是否符合规定,是否合理准确。查看取费基数、是否存在提高取费等级现象,以及是否存在普通装饰工程按专业装饰工程取费的情况。

结束时做好工程竣工后的评价,这是对整个建设项目的一次性综合性评价,也是对项目工程造价控制的总结。主要有以下三个方面的工作: 一是对数据资料进行整理、分析和归类,分析系统的设计是否符合使用者的需求,找出系统建设过程中对造价影响较大的部分,分析影响工程造价的各项因素并建立相应的数据库,为下次项目的控制提供参考; 二是总结造价控制如何在各环节得到有效衔接、如何有效防范价格风险,由被动向主动控制转化的经验; 三是分析自身在全过程造价控制方面的不足,找出其因素并加以克服。后评价工作从表面上来看,对己经形成定局的项目造价没有什么帮助,但是,从长远来看,正是对以前建筑工程建设过程的及时总结,才能在后续项目的系统建设中更有针对性地解决问题,才能更好地实现造价控制的目的。

综上所述,工程造价的控制是一项集管理、技术、质量、施工于一体的综合性的系统工程。因此要求各专业人员从各自的范围着手,有效控制资金投入,才能解决建设资金的需求与有限供给之间的矛盾。加强工程造价控制的重大意义就是在于合理使用人力、物力、财力等,从而取得最佳的经济效益和社会效益。

参考文献